Type | Private |
---|---|
Industry | Nuclear power |
Founded | June 2007 |
Headquarters | Wilmington, N.C., U.S. |
Area served | Worldwide |
Key people | Jay Wileman (President and CEO) |
Number of employees | 3,000 |
Parent | General Electric Hitachi |
Website | nuclear |
GE Hitachi Nuclear Energy (GEH) is a provider of advanced reactors and nuclear services. It is located in Wilmington, N.C. Established in June 2007, GEH is a global nuclear alliance created by General Electric and Hitachi. In Japan, the alliance is Hitachi-GE Nuclear Energy, Ltd.[1] In November 2015, Jay Wileman was appointed CEO.[2]
The Advanced Boiling Water Reactor (ABWR) is the world's first operational Generation III Class advanced light water reactor design. The NRC has docketed GEH's petition for renewal of ABWR certification.[3] The Economic Simplified Boiling Water Reactor (ESBWR), the Generation III+ Class design reactor, received a positive final safety evaluation report and final design approval in March 2011, and is expected to receive a license from the NRC by September 2011.[4][5]
GEH's Power Reactor Innovative Small Modular (PRISM) is a Generation IV reactor that uses liquid sodium as a coolant.
In 2018 GEH agreed to collaborate with Holtec International on the commercialization of the Holtec SMR-160, a 160 MWe pressurized water reactor (PWR) small modular reactor.[6]
As nuclear plants get older and worldwide demand for energy increases, GEH offers a wide range of services that can improve performance, increase power output, and extend plant life.
GEH’s fuel cycle business supplies fuel products and services to customers around the world. GE Hitachi Nuclear Energy owns the Morris Operation—the only de facto high-level radioactive waste storage site in the United States.