ALFRED | |
---|---|
Country | Romania |
Location | Mioveni |
Status | Planned |
Construction cost | EUR 1.0 billion |
Operator(s) | ICN |
Nuclear power station | |
Reactor type | Lead-cooled fast reactor |
Power generation | |
Nameplate capacity | 125 MW |
ALFRED (Advanced Lead-cooled Fast Reactor European Demonstrator) is a planned lead-cooled fast reactor. Designed by Ansaldo Energia from Italy, it represents the last stage of the ELSY and LEADER projects.[1][2]
ALFRED will be built in the Romanian town of Mioveni near Pitesti.[3]
Original source: https://en.wikipedia.org/wiki/ALFRED (nuclear reactor).
Read more |