From HandWiki - Reading time: 1 min
| ALFRED | |
|---|---|
| Country | Romania |
| Location | Mioveni |
| Status | Planned |
| Construction cost | EUR 1.0 billion |
| Operator(s) | ICN |
| Nuclear power station | |
| Reactor type | Lead-cooled fast reactor |
| Power generation | |
| Nameplate capacity | 125 MW |
ALFRED (Advanced Lead-cooled Fast Reactor European Demonstrator) is a planned lead-cooled fast reactor. Designed by Ansaldo Energia from Italy, it represents the last stage of the ELSY and LEADER projects.[1][2]
ALFRED will be built in the Romanian town of Mioveni near Pitesti.[3]