This timeline of spaceflight may require cleanup to ensure consistency with other timeline of spaceflight articles. See Wikipedia:WikiProject Spaceflight/Timeline of spaceflight working group for guidelines on how to improve the article. Details Concerns have been raised that:
|
Orbital launches | |
---|---|
First | 5 January |
Last | 29 December |
Total | 115 |
Catalogued | 110 |
National firsts | |
Space traveller | Syria |
Rockets | |
Maiden flights | ASLV Energia |
Retirements | Atlas H N-II Titan III(34)B |
Crewed flights | |
Orbital | 3 |
Total travellers | 8 |
The following is an outline of 1987 in spaceflight.
Date and time (UTC) | Rocket | Flight number | Launch site | LSP | |||
---|---|---|---|---|---|---|---|
Payload (⚀ = CubeSat) |
Operator | Orbit | Function | Decay (UTC) | Outcome | ||
Remarks | |||||||
5 February 21:38:16 |
Soyuz-U2 | Baikonur Site 1/5 | |||||
Soyuz TM-2 | Low Earth (Mir) | Mir EO-2 | 30 July 01:04:12 |
Successful | |||
Crewed flight launching two cosmonauts and landing three, first crewed flight of Soyuz-TM | |||||||
12 February 06:40 |
Titan 34B/Agena-D | Vandenberg SLC-4W | U.S. Air Force | ||||
SDS-1 F-6[1] | U.S. Air Force | Molniya | Communications | In orbit | Successful | ||
Final flight of the Titan IIIB rocket. Final use of the RM-81 Agena upper stage in any rocket. | |||||||
26 February 23:05 |
Delta 3914 | Cape Canaveral LC-17A | |||||
GOES 7 | NOAA | Geostationary | Weather | In orbit | Operational | ||
20 March 23:05 |
Delta-3920 | Cape Canaveral LC-17 | |||||
Palapa B2-P | PT Pasifik Satelit Nusantara | ? | Communications | In orbit | Successful | ||
31 March 00:16:16 |
Proton-K | Baikonur Site 200/39 | |||||
Kvant-1 | 1991–2001: Roskosmos | Low Earth (Mir) | Mir module | 23 March 2001 05:59:36 |
Successful | ||
Kvant FSB | Low Earth (Kvant-1) | Space tug | 25 August 1988 | Successful | |||
15 May 17:30:01 |
Energia | Baikonur Site 250 | |||||
Polyus | Intended: Low Earth | Weapons tests Technology |
15 May | Launch failure | |||
Maiden flight of Energia, computer error resulted in spacecraft attempting to perform circularisation burn in a retrograde orientation, failed to orbit | |||||||
8 June | RH-300 Mk II | Sriharikota | ISRO | ||||
ISRO | Suborbital | Engineering test | 8 June | Successful | |||
First flight of the RH-300 Mk II, reached an altitude of 130 km (80 miles) | |||||||
22 July 01:59:17 |
Soyuz-U2 | Baikonur Site 1/5 | |||||
Soyuz TM-3 | Low Earth (Mir) | Mir EP-1 | 29 December 09:16:15 |
Successful | |||
Crewed flight with three cosmonauts, first Syrian in space, carried replacement for ill EO-2 crewmember | |||||||
24 August 16:30 |
Skylark 7 | Woomera Test Range LA2 D | MORABA | ||||
Supernova (W-GR-147) | DFVLR | Suborbital | X-ray astronomy | 24 August | Successful | ||
Apogee: ~270 km | |||||||
8 October | Sonda IV | Barreira do Inferno Launch Center | IAE | ||||
IAE | Suborbital | Engineering test | 8 October | Successful | |||
"Operation Petrópolis". R&D launch for the VLS program. 510 kg payload. 570 km apogee.[2] | |||||||
21 November 02:19:00 |
Ariane 2 | Kourou ELA-2 | Arianespace | ||||
TV-SAT 1 | Deutsche Bundespost | Current: Graveyard Operational: Geosynchronous |
Communications | In orbit | Spacecraft failure | ||
Immediately after launch, one of its solar panels failed to deploy, and as a result of this the main uplink antenna, which was located behind the solar panel, could not deploy either. Briefly used to verify the systems of the Spacebus 300 satellite bus before being retired to a graveyard orbit. | |||||||
21 December 11:18:03 |
Soyuz-U2 | Baikonur Site 1/5 | |||||
Soyuz TM-4 | Low Earth (Mir) | Mir EO-3 | 17 June 1988 10:12:32 |
Successful | |||
Crewed flight with three cosmonauts |
There were no deep-space rendezvous in 1987.