The Great Venezuela Railway (Gran Ferrocarril de Venezuela) was a 179-kilometre (111 mi) 3 ft 6 in (1,067 mm) railway from Caracas to Valencia. The railway was the longest in Venezuela. It proved difficult to recoup the initial investment and the railway became a notable cause of the Venezuelan crisis of 1902–1903. It fell into disrepair through the early 20th century and the last train ran in 1966.[1]
Friedrich Krupp AG contracted with the Venezuelan government in 1888 to build the railway in exchange for £12,800 per kilometer to be repaid at 7 percent interest. Disconto-Gesellschaft financed the project; and terms were renegotiated at £11,000 per kilometer in 1891. The railway was completed in February 1894.[2]
The railway replaced a difficult carriage road through mountainous terrain. Caracas is at an altitude of 3,000 feet (910 metres) and to reach Valencia the railway had to climb higher to cross the Coastal Range. Contemporary accounts expressed great praise for the construction, which used Krupp steel railroad ties.[3]
The Caracas terminus was adjacent to the 3 ft (914 mm) gauge La Guaira and Caracas Railway to the coast, which operated until 1951.[4][5] The Great Venezuela Railway entered the 285-metre (935 ft) Calvario tunnel for level grade to Antímano where a 2 percent climb began to a 1,227-metre (4,026 ft) summit in 267-metre (876 ft) Corozal tunnel 30 kilometres (19 mi) from Caracas. From Corozal tunnel the railway required 212 Krupp steel viaducts and 84 tunnels to cover 44 kilometres (27 mi) of gently descending grade across steep canyons to reach the fertile valley of Lake Valencia. The 106-metre (348 ft) viaduct over Agua Amarillo was the longest on the line and stood 47 metres (154 ft) above the water.[6] The Valencia terminus was at San Blas, but the line was eventually connected to the Puerto Cabello and Valencia Railway which had its own terminus at Camoruco.
By 1922 the railway had 18 locomotives, 30 passenger cars, 68 flatcars, and 20 stock cars.[7] Although the 4-4-4T locos could reach 70 km/h (43 mph), trains took 7 hours for the 179 km.[8]
Early in the line's history it was adversely affected by political instability in Venezuela. Krupp computed Venezuela's debt (including damages arising from the revolution against Venezuelan president Raimundo Andueza Palacio) as £1,900,000. Suspension of debt payments by Cipriano Castro in 1901 was followed by the Venezuelan crisis of 1902–1903, a naval blockade involving gunboat diplomacy.[9]
The summit section of the railway forms part of a recreation park called Parque El Encanto (El Encanto is also the name of one of the stations). Work began in 2015 on a 350 million bolivar plan to restore 7 km (4.3 mi) of track as a heritage railway, with 7 tunnels and 5 bridges, providing for a 25-minute journey from Los Lagos to El Encanto.[10]