Gwangju Metro | |||
---|---|---|---|
Overview | |||
Locale | Gwangju, South Korea | ||
Transit type | Rapid transit | ||
Number of lines | 1 | ||
Number of stations | 20 | ||
Operation | |||
Began operation | 28 April 2004 | ||
Operator(s) | Gwangju Metropolitan Rapid Transit Corporation | ||
Technical | |||
System length | 20.1 km (12.5 mi) | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | ||
|
Gwangju Metro | |
Hangul | |
---|---|
Hanja | |
Revised Romanization | Gwangju Dosi Cheoldo |
McCune–Reischauer | Kwangchu Tosi Ch'ŏldo |
Gwangju Metro (Korean: 광주 도시철도; Hanja: 光州都市鐵道) is the rapid transit system of Gwangju, South Korea, operated by the Gwangju Metropolitan Rapid Transit Corporation (GRTC, or Gwangju Metro). The subway network first opened in 2004 with 14 stations. The Gwangju Metro consists of one line, serving 20 operational stations, and operating on 20.1 kilometres (12.5 mi) of route.[citation needed] It crosses both of the major rivers in Gwangju, the Yeongsan River and the Hwangryong River. Most of the system is underground, except for the sections between Sotae-Nokdong and Pyeongdong-Dosan.
Line Name English |
Line Name Hangul |
Starting Station(s) | Ending Station(s) | Stations | Total Length in km |
---|---|---|---|---|---|
Line 1 | 1호선 | Nokdong | Pyeongdong | 20 | 20.6 |
As of 2021 Line 1 consists of twenty stations. Most trains run between Pyeongdong and Sotae, with about one train per hour continuing towards Nokdong.[1]
Line 2 (ko) of the subway is under construction as of 2021. It is scheduled to open in three phases between 2023 and 2025.[2][3][4]
The Gwangju City Government has a plan to extend the current Line 1 eastward to Hwasun and westward to Naju. In 2009, the Presidential Committee on Balanced National Development promised to include the Line 1 extension in its '5+2 extensive economic zone' project.[5]
Line 2 was originally planned as a circle line, but the Gwangju City Government also considered a 'South-North type' as well. After the results of a public hearing conducted in 2019 construction started as originally planned, with the first section of the line being scheduled to open in 2023. Phases 2 and 3 are scheduled to open in 2024 and 2025, respectively.[6]