Johnsonville Combustion Turbine Plant | |
---|---|
Country | United States |
Location | New Johnsonville, Tennessee |
Coordinates | 36°2′6″N 87°59′2″W / 36.03500°N 87.98389°W |
Status | Operational |
Commission date | Units 1–16: 1975 Units 17–20: 2000 |
Owner | Tennessee Valley Authority |
Operator | Tennessee Valley Authority |
Thermal power station | |
Primary fuel | Natural gas |
Cooling source | Tennessee River |
Power generation | |
Units operational | 20 |
Nameplate capacity | 1,200 MW |
The Johnsonville Combustion Turbine Plant is a 1.2-gigawatt (1,200 MW), simple cycle natural gas power plant located in New Johnsonville, Tennessee in Humphreys County, Tennessee. It is operated by the Tennessee Valley Authority (TVA).
In 1975 the TVA constructed 16 combustion turbine units at Johnsonville. Four more combustion turbine units were added in 2000.[1] These 20 units have a combined generating capacity of 1.2 gigawatts.[2] With the closure of the Johnsonville Fossil Plant, the TVA added a heat recovery generator to one of the combustion turbine units in 2017 to create the steam needed to produce titanium dioxide (TiO
2) at the nearby Chemours plant.[1]