Line 11 | |
---|---|
Overview | |
Status | In operation |
Owner | Suzhou Rail Transit Co., Ltd |
Termini | |
Stations | 28[1] |
Service | |
Type | Rapid transit |
System | Suzhou Rail Transit |
Operator(s) | Suzhou Rail Transit Co., Ltd |
Rolling stock | 6-car Class B[2] |
History | |
Opened | 24 June 2023[3] |
Technical | |
Line length | 41.27 km (25.64 mi) |
Number of tracks | 2 |
Character | Underground[4][5] |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | overhead wire |
Operating speed | 100 km/h (maximum) |
Line 11[6] is a rapid transit line of the Suzhou Rail Transit system. It was formerly known as Line S1 during planning and construction. Construction started on November 27, 2018. It opened on 24 June 2023.[3][7][8] The line uses driverless 6-car Class B rolling stock operating up to 100 km/h (62 mph).[9][10] Partial through-running on Line 3 began on December 23, 2023, and full through-running began on June 29, 2024.
Running west-east, the line mainly serves the urban area of Kunshan, and connects it to Suzhou Industrial Park in the west and nearby Shanghai in the east via a transfer at Huaqiao station to Line 11 of Shanghai Metro.[1] The line is the first metro line in downtown Kunshan.[4]
Service Routes | Station name[11] | Connections | Distance[12] km |
Location | ||
---|---|---|---|---|---|---|
L | R | English | Chinese | |||
↑ | Through service to/from Suzhou Xinqu Railway Station on 3 | |||||
● | Weiting | 唯亭 | 0.00 | SIP | ||
● | Caoxieshan | 草鞋山 | 2.12 | |||
● | Yangchenghu East | 阳澄湖东 | 6.35 | Kunshan | ||
● | Zhengyi | 正仪 | AIH | 7.95 | ||
● | Lianhugongyuan | 莲湖公园 | 9.95 | |||
● | Zuchongzhigongyuan | 祖冲之公园 | 11.27 | |||
● | Kunshan Wenhuayishuzhongxin | 昆山文化艺术中心 | 12.18 | |||
● | ● | Gongqing | 共青 | 13.48 | ||
● | ● | Jiangpu | 江浦 | 14.41 | ||
● | | | Baimajing | 白马泾 | 15.82 | ||
● | ● | Yushanguangchang | 玉山广场 | 17.20 | ||
● | | | Xiuyi | 绣衣 | 18.55 | ||
● | ● | Kunshan Chengshiguangchang | 昆山城市广场 | 19.64 | ||
● | | | Jinpudaqiao East | 金浦大桥东 | 20.86 | ||
● | | | Shunfanbeilu | 顺帆北路 | 21.99 | ||
● | | | Yuchijing | 鱼池泾 | 22.92 | ||
● | | | Baihetan | 白河潭 | 23.94 | ||
● | ● | Bingxi | 兵希 | 25.04 | ||
● | | | Xiajiahegongyuan | 夏驾河公园 | 26.33 | ||
● | | | Shengzhuang | 盛庄 | 27.92 | ||
● | | | Zhangjilu South | 章基路南 | 29.41 | ||
● | | | Xiaqiao | 夏桥 | 31.25 | ||
● | ● | Shentongjing | 神童泾 | 33.51 | ||
● | | | Lujia | 菉葭 | 34.85 | ||
● | ● | Huaqiao Bolanzhongxin | 花桥博览中心 | 37.16 | ||
● | ● | Jishan | 集善 | 38.65 | ||
● | | | Huaxigongyuan | 花溪公园 | 39.97 | ||
● | ● | Huaqiao | 花桥 | 11 | 41.17 | |
Through service between Line 3 and Line 11 started on December 23, 2023.[13]
Fleet numbers | Year Built | Time in service | Builder | Class | Number in service | No of car |
Assembly | Rolling stock | Number | Depots | Line assigned | Notes |
---|---|---|---|---|---|---|---|---|---|---|---|---|
210 (35 sets) | 2022-2023 | 2023-present | CRRC Nanjing Puzhen | B | 210 (35 sets) | 6 | Tc+Mp+M - M + Mp+Tc | PM187 | 110101-113506 (1101-1135) | Xushuguan Depot South Weiting Yard Chaoyang Road Depot Huaqiao Yard |
3 11 |