From Wikipedia - Reading time: 5 min
| Line 3 | |
|---|---|
| 3 | |
Nansanhuanlu station | |
| Overview | |
| Native name | 徐州地铁3号线 |
| Status | Operational |
| Locale | Xuzhou, Jiangsu |
| Termini | |
| Stations | 22 |
| Service | |
| Type | Rapid transit |
| System | Xuzhou Metro |
| Rolling stock | Type B (CRRC Nanjing Puzhen)[1] |
| History | |
| Opened | June 28, 2021 |
| Technical | |
| Line length | 26.26 km (16.32 mi) |
| Number of tracks | 2 |
| Character | Underground and Elevated |
| Operating speed | 80 km/h (50 mph) |
Line 3 of the Xuzhou Metro (Chinese: 徐州地铁3号线) is a rapid transit line in Xuzhou city, Jiangsu province, China. It is the third metro line to open in Xuzhou.
Phase 1 of Line 3 was opened on June 28, 2021.[2][3] It is 18.13 km in length and fully underground.[4][5]
Phase 2 of Line 3 opened on 3 December 2024.[6] It added 6 stations (5 stations in the Northern extension and 1 station in the Southern extension) and a total of 8.13 km in length (1.57 km South extension and 6.56 km North extension).[7] The South extension is elevated and the North extension is underground.
| Station name | Connections | Distance km |
Location | ||
|---|---|---|---|---|---|
| English | Chinese | ||||
| Zhenxingdadao | 振兴大道[8] | 0 | 0 | Gulou | |
| Pantao | 蟠桃[8] | ||||
| Jiangsu Xuzhou Higher Vocational School of Economics & Trading | 经贸学校[8] | 4 | |||
| Jinshanqiao | 金山桥[8] | ||||
| Yangzhuang | 杨庄[8] | ||||
| Xiadian | 下淀 | ||||
| Baiyunshan | 白云山 | ||||
| Xuzhou Railway Station | 徐州火车站 | 1 |
Gulou / Yunlong | ||
| Tianqiao | 天桥 | Yunlong | |||
| Hepingdaqiao | 和平大桥 | ||||
| Huaita | 淮塔 | 2 | Quanshan | ||
| CUMT Wenchang Campus | 矿大文昌校区 | ||||
| Nansanhuanlu | 南三环路 | 4 | |||
| Zhaishan | 翟山 | ||||
| Jiangsu Normal University | 师范大学 | Tongshan | |||
| Yuquanhe | 玉泉河 | 6 | |||
| Wumingshan Park | 无名山公园 | ||||
| Pujianglu | 浦江路 | ||||
| Jiaoshan | 焦山 | ||||
| Qianjianglu | 钱江路 | ||||
| Gaoxinqu'nan | 高新区南 | ||||
| Yinshan | 银山[8] | ||||
3号线二期运营总里程8.13公里,其中南段里程1.57公里,设站1座,为银山站;北段里程6.56公里,设站5座