List of generating stations in British Columbia

From Wikipedia - Reading time: 19 min

This is a list of electrical generating stations in British Columbia, Canada.

Hydroelectric

[edit]

List of most of the hydroelectric generating stations in British Columbia.

  Facilities under construction
  Planned facilities
  Decommissioned facilities

Hydroelectric stations owned by BC Hydro

[edit]

A list of all grid-tied hydroelectric generation stations in British Columbia operated by BC Hydro[1]

Name Location Capacity (MW) Date Ref
Aberfeldie Dam 49°29′56″N 115°21′2″W / 49.49889°N 115.35056°W / 49.49889; -115.35056 (Aberfeldie) 25.0 1953 [1]
Alouette Lake 49°17′10″N 122°29′14″W / 49.28611°N 122.48722°W / 49.28611; -122.48722 (Alouette) 9.0 1928 [1]
Ash River 49°22′30″N 125°9′12″W / 49.37500°N 125.15333°W / 49.37500; -125.15333 (Ash River) 28.0 1959 [1]
Bridge River 50°43′54″N 122°14′33″W / 50.73167°N 122.24250°W / 50.73167; -122.24250 (Bridge River) 478.0 1948 [1]
Cheakamus 49°56′4″N 123°17′21″W / 49.93444°N 123.28917°W / 49.93444; -123.28917 (Cheakamus) 158.0 1957 [1]
Clowhom 49°42′41″N 123°32′7″W / 49.71139°N 123.53528°W / 49.71139; -123.53528 (Clowhom) 33.0 1957 [1]
Elko 49°17′22″N 115°6′15″W / 49.28944°N 115.10417°W / 49.28944; -115.10417 (Elko) 12.0 1924 [1]
Falls River 53°58′59″N 129°44′03″W / 53.98306°N 129.73417°W / 53.98306; -129.73417 (Falls River) 7.0 1930 [1]
Gordon M. Shrum (W.A.C. Bennett Dam) 56°0′58″N 122°12′19″W / 56.01611°N 122.20528°W / 56.01611; -122.20528 (W. A. C. Bennett Dam) 2,730.0 1968 [1]
John Hart 50°2′35″N 125°18′38″W / 50.04306°N 125.31056°W / 50.04306; -125.31056 (John Hart) 138.0 1947 [1][2]
Jordan River 48°28′37″N 123°59′51″W / 48.47694°N 123.99750°W / 48.47694; -123.99750 (Jordan River) 170.0 1971 [1]
Kootenay Canal 49°27′10″N 117°30′55″W / 49.45278°N 117.51528°W / 49.45278; -117.51528 (Kootenay Canal) 583.0 1975 [1]
Ladore 50°0′53″N 125°23′27″W / 50.01472°N 125.39083°W / 50.01472; -125.39083 (Ladore) 47.0 1956 [1]
La Joie 50°50′14″N 122°51′29″W / 50.83722°N 122.85806°W / 50.83722; -122.85806 (Lajoie Dam) 25.0 1957 [1]
Lake Buntzen 49°22′30″N 122°52′07″W / 49.37500°N 122.86861°W / 49.37500; -122.86861 (Lake Buntzen) 76.8 1951 [1]
Mica 52°4′35″N 118°34′0″W / 52.07639°N 118.56667°W / 52.07639; -118.56667 (Mica Dam) 2,746.0 1976 [1]
Peace Canyon 55°58′57″N 121°59′34″W / 55.98250°N 121.99278°W / 55.98250; -121.99278 (Peace Canyon Dam) 694.0 1980 [1]
Puntledge 49°41′15″N 125°2′3″W / 49.68750°N 125.03417°W / 49.68750; -125.03417 (Puntledge) 24.0 1955 [1]
Revelstoke 51°3′15″N 118°11′40″W / 51.05417°N 118.19444°W / 51.05417; -118.19444 (Revelstoke dam) 2,480.0 1984 [1]
Ruskin 49°11′43″N 122°24′28″W / 49.19528°N 122.40778°W / 49.19528; -122.40778 (Ruskin) 105.0 1930 [1]
Seton 50°40′23″N 121°55′27″W / 50.67306°N 121.92417°W / 50.67306; -121.92417 (Seton) 48.0 1956 [1]
Seven Mile 49°1′47″N 117°30′11″W / 49.02972°N 117.50306°W / 49.02972; -117.50306 (Seven Mile) 805.0 1979 [1]
Shuswap 50°17′44″N 118°48′45″W / 50.29556°N 118.81250°W / 50.29556; -118.81250 (Shuswap) 6.0 1929 [1]
Spillimacheen 50°54′11″N 116°24′33″W / 50.90306°N 116.40917°W / 50.90306; -116.40917 (Spillimacheen) 4.0 1955 [1]
Stave Falls 49°13′46″N 122°21′17″W / 49.22944°N 122.35472°W / 49.22944; -122.35472 (Stave Falls) 91.0 1912 [1]
Strathcona 49°59′48″N 125°3′56″W / 49.99667°N 125.06556°W / 49.99667; -125.06556 (Strathcona) 64.0 1958 [1]
Wahleach 49°15′1″N 121°36′20″W / 49.25028°N 121.60556°W / 49.25028; -121.60556 (Wahleach) 65.0 1952 [1]
Walter Hardman 50°48′36″N 118°3′53″W / 50.81000°N 118.06472°W / 50.81000; -118.06472 (Walter Hardman) 8.0 1960 [1]
Waneta Dam* 49°00′15″N 117°36′43″W / 49.0040768°N 117.6118693°W / 49.0040768; -117.6118693 (Waneta) 490.0 1952 [3][4]
Whatshan 49°54′59″N 118°7′0″W / 49.91639°N 118.11667°W / 49.91639; -118.11667 (Whatshan) 55.0 1972 [1]
Site C Dam 56°11′41″N 120°54′51″W / 56.19472°N 120.91417°W / 56.19472; -120.91417 (Site C) 1,100 ~2024 [5]
Total operating stations (MW) 11,714.8

*Waneta Dam has been wholly owned by BC Hydro since July 2018[6] after Fortis BC finalized an agreement with Teck to sell its 66% interest in the dam, but BC Hydro had first rights to purchase the remaining 66% from its first 1/3 ownership deal.[7]

Privately-owned hydroelectric stations

[edit]

This list includes all grid-connected hydroelectric generating stations not owned by the Crown Corporation BC Hydro. This list includes stations owned and operated by Independent Power Producers as well as by private utilities such as Nelson Hydro and FortisBC. In some cases, such as Lois Lake and Powell Lake, the electricity generated may be used solely for private industry, even if it is grid-connected.

Name Location Capacity (MW) Date Owner Ref
Akolkolex 50°49′21″N 118°01′46″W / 50.82250°N 118.02944°W / 50.82250; -118.02944 (Akolkolex) 10 1995 TransAlta [8]
Arrow Lakes/Keenleyside Dam 49°20′22″N 117°46′19″W / 49.33944°N 117.77194°W / 49.33944; -117.77194 (Arrow Lakes GS) 185 2002 Columbia Power Corporation [9]
Ashlu Creek 49°54′51″N 123°19′30″W / 49.91417°N 123.32500°W / 49.91417; -123.32500 (Ashlu Creek) 49.9 2010 Innergex Renewable Energy [10]
Barr Creek Tahsis 4.4 2011 Synex International [11]
Big Silver Creek 49°41′33″N 121°51′37″W / 49.69250°N 121.86028°W / 49.69250; -121.86028 (Harrison Lake) 40.6 2016 Innergex Renewable Energy [12]
Bone Creek Valemount 19 2011 TransAlta [13]
Bonnington Falls Nelson 16 1905 Nelson Hydro [14]
Boston Bar Hydro (Scuzzy Creek) 49°48′41″N 121°27′30″W / 49.81139°N 121.45833°W / 49.81139; -121.45833 (Scuzzy Creek) 9 1995 Boston Bar LP [15]
Boulder Creek 50°38′7″N 123°24′12″W / 50.63528°N 123.40333°W / 50.63528; -123.40333 (Pemberton) 25.3 2017 Innergex Renewable Energy [16]
Box Canyon 49°33′42″N 123°23′22″W / 49.56167°N 123.38944°W / 49.56167; -123.38944 (Port Mellon) 16 2017 Elemental Energy [17]
Brandywine Creek 50°03′28″N 123°07′52″W / 50.05778°N 123.13111°W / 50.05778; -123.13111 (Brandywine Creek) 7.6 2003 Eco Flow Energy [18]
Brilliant Dam 49°19′29″N 117°37′12″W / 49.3246884°N 117.6200366°W / 49.3246884; -117.6200366 (Brilliant Dam) 145 1944 Columbia Power Corporation [9]
Brilliant Expansion 49°19′23″N 117°37′11″W / 49.3230941°N 117.6198435°W / 49.3230941; -117.6198435 (Brilliant Dam) 120 2009 Columbia Power Corporation [9]
Brown Lake 54°01′38″N 129°50′37″W / 54.02722°N 129.84361°W / 54.02722; -129.84361 (Brown Lake) 7.2 1996 Innergex Renewable Energy [19]
Canoe Creek Ucluelet 6 2010 Tla-o-qui-aht First Nations [20]
Castle Creek McBride 8 2010 Castle Mountain Hydro Ltd. [21]
China Creek Port Alberni 6.3 2005 Upnit Power Corporation [22]
Coats IPP Gabriola Island 0.5 1985 Crofter's Gleann Enterprises Ltd. [15]
Corra Linn Dam 49°28′2″N 117°28′0″W / 49.46722°N 117.46667°W / 49.46722; -117.46667 (Corra Linn) 49 1932 FortisBC [23]
Culliton Creek 49°52′41″N 123°9′38″W / 49.87806°N 123.16056°W / 49.87806; -123.16056 (Culliton Creek) 15 2016 BluEarth Renewables [24]
Cypress Creek Gold River 2.8 2009 Synex Energy Resources Ltd [25]
Dasque Creek Terrace 12 2015 BluEarth Renewables [26][27]
Doran Taylor Hydro Port Alberni 6 1996 Summit Power [15]
Douglas Creek (Kwalsa Energy) 49°46′3″N 122°9′4″W / 49.76750°N 122.15111°W / 49.76750; -122.15111 (Douglas Creek) 27.6 2010 Innergex Renewable Energy [28]
Eagle Lake Micro Hydro West Vancouver 0.2 2003 District of West Vancouver [29]
East Toba Powell River 147 2010 Innergex Renewable Energy [30]
East Twin McBride 1.6 1991 Brookfield Renewable Power [31]
Eldorado Reservoir Kelowna 1.1 2009 District of Lake Country [32]
Fire Creek (Kwalsa Energy) 49°46′59″N 122°14′5″W / 49.78306°N 122.23472°W / 49.78306; -122.23472 (Fire Creek) 25 2010 Innergex Renewable Energy [33]
Fitzsimmons Creek Whistler 7.9 2010 Innergex Renewable Energy [34]
Furry Creek Furry Creek 10.4 2004 BluEarth Renewables [35]
Forrest Kerr Generating Station 56°43′30″N 130°40′22″W / 56.72500°N 130.67278°W / 56.72500; -130.67278 (Forrest Kerr Generating Station) 195 2014 Northwest Hydro [36]
Haa-ak-suuk Creek Hydro Ucluelet 6 2010 Tla-o-qui-aht First Nations [37]
Hauer Creek (aka Tete) Valemount 2.4 2007 Hauer Creek Power Inc. [15]
Hunter Creek Hope 12 2018 Connor, Clark & Lunn [38][15]
Hystad Creek Valemount 6 2002 Brookfield Renewable Power [31]
Jamie Creek 50°49′42″N 123°3′24″W / 50.82833°N 123.05667°W / 50.82833; -123.05667 (Jamie Creek) 22 2014 Boralex [39]
Jimmie Creek (Upper Toba Valley) 50°34′11″N 124°4′20″W / 50.56972°N 124.07222°W / 50.56972; -124.07222 (Jimmie Creek) 62 2016 Innergex Renewable Energy [40]
Kemano Generating Station 53°33′48″N 127°56′32″W / 53.563278°N 127.942167°W / 53.563278; -127.942167 (Kemano) 896 1953 Rio Tinto Alcan [41]
Kokish River Port McNeil 45 2014 Brookfield Renewable Power [42]
Kwoiek Creek 50°6′16″N 121°34′25″W / 50.10444°N 121.57361°W / 50.10444; -121.57361 (Kwoiek Creek) 49.9 2013 Innergex Renewable Energy, Kanaka Bar Indian Band [43]
Lamont Creek (Upper Stave Energy) 49°33′58″N 122°21′1″W / 49.56611°N 122.35028°W / 49.56611; -122.35028 (Lamont Creek) 28 2010 Innergex Renewable Energy [44]
Lois Lake Powell River 37.4 1930 Brookfield Renewable Power [45]
Long Lake (Cascade Creek) Stewart 31 Regional Power Inc. [46]
Lorenzetta Creek Laidlaw 3.2 2016 Zella Hydro [47]
Lower Bear Creek Sechelt 10 2011 Regional Power Inc. [48]
Lower Bonnington 49°27′39″N 117°29′58″W / 49.46083°N 117.49944°W / 49.46083; -117.49944 (Lower Bonnington) 66 1925 FortisBC [23]
Lower Clowhom Sechelt 11 2009 BluEarth Renewables [49]
Mamquam Hydro Squamish 58 1996 Atlantic Power Corporation [50]
Marion 3 Creek Port Alberni 4.6 2005 Marion Creek Hydro Inc. [51]
McDonald Ranch Grasmere 0.1 1993 McDonald Ranch & Timber Co. Ltd. [15]
McIntosh Creek McBride 1.2 2014 Snowshoe Power Ltd. [15]
McLymont Creek Stewart 66 2015 Northwest Hydro [52]
McNair Creek Hydro Port Mellon 9.8 2004 BluEarth Renewables [53]
Mears Creek Gold River 3.8 2004 Synex Energy Resources Ltd [25]
Middle Creek Terrace 8 2015 BluEarth Renewables [26][27]
Miller Creek Pemberton 29.5 2003 Innergex Renewable Energy [54]
Montrose Creek Powell River 88 2010 Innergex Renewable Energy [55]
Morehead Creek Williams Lake 0.11 1994 Morehead Valley Hydro [56]
Northwest Stave River Mission 17.5 2013 Innergex Renewable Energy [57]
Pingston Creek Revelstoke 45 2003 Brookfield Renewable Power, TransAlta [58]
Powell Lake Powell River 46 1911 Brookfield Renewable Power [45]
Ptarmigan Creek McBride 3.6 1993 Robson Valley Power Corp [15]
Raging River 2 Port Alice 8 2002 Raging River Power & Mining Inc. [15]
Rutherford Creek Mount Currie 49.9 2004 Innergex Renewable Energy [59]
Sakwi Creek Agassiz 5.5 2014 Connor, Clark & Lunn [60]
Seaton Creek Hydro (Homestead) New Denver 0.3 1997 Homestead Hydro Systems [15]
Sechelt Creek (Salmon Inslet) Sechelt 16.6 1997 Capstone Infrastructure [61][62]
Silversmith Sandon 0.2 1897 Silversmith Power & Light [63][15]
Skookum Creek Squamish 25 2014 Eco Flow Energy [64]
Soo River 50°13′34″N 122°54′41″W / 50.22611°N 122.91139°W / 50.22611; -122.91139 (Soo River) 13.1 1994 Summit Power [15]
South Cranberry Creek Revelstoke 9 2008 Advanced Energy Systems Ltd. [15]
South Slocan 49°27′24″N 117°31′5″W / 49.45667°N 117.51806°W / 49.45667; -117.51806 (South Slocan) 54 1928 FortisBC [23]
South Sutton Creek Port Alberni 4.9 2005 South Sutton Creek Hydro Inc. [15]
Stokke Creek (Kwalsa Energy) 49°42′39″N 122°2′3″W / 49.71083°N 122.03417°W / 49.71083; -122.03417 (Stokke Creek) 21 2010 Innergex Renewable Energy [65]
Tipella Creek (Kwalsa Energy) 49°44′27″N 122°9′44″W / 49.74083°N 122.16222°W / 49.74083; -122.16222 (Tipella Creek) 16.7 2010 Innergex Renewable Energy [66]
Tretheway Creek Harrison Lake 21.2 2015 Innergex Renewable Energy [67]
Tyson Creek Hydro Sechelt 9.3 2009 BluEarth Renewables [68]
Upper Bear Creek Sechelt 10 2012 Regional Power Inc. [48]
Upper Bonnington 49°27′36″N 117°29′1″W / 49.46000°N 117.48361°W / 49.46000; -117.48361 (Upper Bonnington) 66 1907 FortisBC [23]
Upper Clowhom Sechelt 11 2009 BluEarth Renewables [49]
Upper Lillooet River Pemberton 81.4 2017 Innergex Renewable Energy [69]
Upper Mamquam Squamish 25 2005 TransAlta [70]
Upper Stave River (Upper Stave Energy) 49°37′22″N 122°26′58″W / 49.62278°N 122.44944°W / 49.62278; -122.44944 (Upper Stave River) 33.5 2010 Innergex Renewable Energy [71]
Volcano Creek Stewart 16 2015 Northwest Hydro [72]
Walden North Lillooet 16 1993 Innergex Renewable Energy [15]
Waneta Expansion Trail 335 2015 FortisBC [73][15]
Winchie Creek Ucluelet 4.4 2018 Tla-o-qui-aht First Nations [74]
Woodfibre Dam Squamish 1.6 1947 Western Pulp LP [15]
Zeballos Lake Zeballos 21.85 2009 Zeballos Lake Hydro LP [15]
Bremner Creek Harrison Lake 25 Pacific Greengen Power [75]
Trio Creek Harrison Lake 25 Pacific Greengen Power [75]
Chickwat Creek Sechelt Inlet 19 BluEarth Renewables [76]
Lower Ramona Sechelt Inlet 7 BluEarth Renewables [76]
Upper Ramona Sechelt Inlet 7 BluEarth Renewables [76]
Clemina Creek Hydro Valemount 10.5 Sorgent.e Hydro Canada [75]
Serpentine Creek Hydro Blue River 10.5 Sorgent.e Hydro Canada [75]
Wedgemount Creek Whistler 5.4 Wedgemount Power LP [75]
Gabion River EPA Hartley Bay 0.95 Gitga'at Economic Partnership [77][75]
Total operating stations (MW) 3,705.6

Other renewables

[edit]

Biomass, biogas and waste heat

[edit]

List of all biomass, biogas and waste heat power plants in British Columbia.

Name Location Capacity (MW) Date Owner Fuel Ref
150 Mile House 150 Mile House 6 EnPower Waste heat [78]
Armstrong Wood Waste Co-Gen Armstrong 20 2002 Riverside Forest Products Biomass [15]
Burnaby Incinerator (SEEGEN) Burnaby 22 2003 Montenay Inc. Biomass [79]
Cache Creek landfill gas utilization Plant Cache Creek 4.5 2015 Wastech Management Services Biogas [80][15]
Cariboo Pulp & Paper Quesnel 61.3 2012 West Fraser Timber Biomass [81][15]
Cedar Road LFG Inc. Nanaimo 1.4 2009 Cedar Road LFG Inc. Biogas [82]
Celgar Mill Castlegar 52 Mercer International Biomass [83][84]
Chetwynd Biomass Chetwynd 13 2014 West Fraser Timber Biomass [81][15]
Conifex Bioenergy Mackenzie 36 2015 Conifex Biomass [85][15]
Crowsnest Pass Sparwood 7.1 2013 Kensington Capital Partners Waste Heat [86][15]
BioNorth Energy Fort St. James 40 2018 BioNorth Energy LP Biomass [87][15]
Fraser Lake Biomass Fraser Lake 13 2014 West Fraser Timber Biomass [81][15]
Fraser Richmond Soil and Fibre Richmond 1.03 2012 Harvest Power Biomass [88]
Greater Nanaimo PCC Cogeneration Nanaimo 0.355 2019 Regional District of Nanaimo Biogas [15][89]
Harmac Biomass Nanaimo 55 2014 Nanaimo Forest Products Ltd. Biomass [90]
Hartland Landfill Project Victoria 1.6 Maxim Power Biomass [91]
Howe Sound Green Energy Port Mellon 112 2010 Howe Sound Pulp and Paper Corporation Biomass [92][15]
Intercon Green Power Prince George 31.7 Canfor Biomass [15]
Kamloops Green Energy Kamloops 76 Domtar Biomass [15]
LP Golden Biomass Golden 7.5 Louisiana-Pacific Canada Ltd. Biomass [15]
Merritt Green Energy Merritt 40 2018 Veolia Biomass [87][15]
Nanaimo Reservoir No. 1 Energy Recovery Nanaimo 0.1 2014 City of Nanaimo Waste kinetic energy [15]
Northwood Green Power Prince George 63 Canfor Biomass [15]
PGP Bio Energy Project Prince George 60 Canfor Biomass [15]
Powell River Generation Powell River 48 2015 Catalyst Paper Corporation Biomass [15]
Savona Generating Station Savona 5.9 2008 EnPower Waste heat [78]
Skookumchuk Power Project Skookumchuk 51 Tembec Biomass [15]
Tolko Kelowna Cogeneration Kelowna 14.9 2007 Tolko Industries Biomass [15]
Vancouver Landfill Project Delta 7.4 2003 Maxim Power Biomass [93]
Williams Lake Power Plant Williams Lake 66 Atlantic Power Corporation Biomass [94]
Total operating stations (MW) 837.5

Solar photovoltaic

[edit]

List of all solar photovoltaic power stations in British Columbia.

Name Location Capacity (MW) Date Owner Ref
SunMine Kimberley 1.05 2015 City of Kimberley [95]
Tsilhqot'in Solar Farm Hanceville 0.99 2019? Tsilhqot’in Nation [96]
Total operating stations (MW) 2.04

Wind

[edit]

List of all wind farms in British Columbia.

Name Location Capacity (MW) Date Owner Ref
Bear Mountain Wind Park Dawson Creek 102 2009 AltaGas [97]
Cape Scott Wind Farm Port Hardy 99.2 2013 GDF-Suez [98]
Dokie Wind Chetwynd 144 2011 Innergex Renewable Energy [99]
Eye of the Wind 49°22′15″N 123°5′56″W / 49.37083°N 123.09889°W / 49.37083; -123.09889 (Eye of the Wind) 1.5 2010 Grouse Mountain [100]
Meikle Wind Farm Tumbler Ridge 179 2017 Pattern Energy/PSP Investments [101][102][103]
Pennask Wind Farm 49°55′26″N 120°6′14″W / 49.92389°N 120.10389°W / 49.92389; -120.10389 (Westbank) 15 2017 Okanagan Wind [104]
Quality Wind Project Tumbler Ridge 142.2 2012 Capital Power Corporation [105]
Shinish Creek Wind Farm 49°39′39″N 120°8′13″W / 49.66083°N 120.13694°W / 49.66083; -120.13694 (Summerland) 15 2017 Okanagan Wind [104]
Moose Lake Wind Project Tumbler Ridge 15 2019 Boralex [106][107]
Septimus Creek Wind Farm Taylor 15 2018? Zero Emission Energy Developments Inc. [108]
Total operating stations (MW) 703.9

Natural gas

[edit]

List of all natural gas power plants in British Columbia.

Name Location Capacity (MW) Date Owner Ref
Fort Nelson Generating Station 58°43′26″N 122°42′4″W / 58.72389°N 122.70111°W / 58.72389; -122.70111 73.0 1999 BC Hydro [109][1]
Houweling Nurseries Cogeneration Delta 8.8 2014 Houweling's Tomatoes [110]
Island Generating Station Campbell River 275 2002 Capital Power Corporation [111]
McMahon Cogeneration Plant Taylor 105 1993 Heartland Generation [112]
Prince Rupert Generating Station 54°17′0″N 130°18′25″W / 54.28333°N 130.30694°W / 54.28333; -130.30694 46.0 1975 BC Hydro [109][1]
Burrard Generating Station (decommissioned in 2016) 49°17′56″N 122°53′25″W / 49.29889°N 122.89028°W / 49.29889; -122.89028 950 1961 BC Hydro
Total operating stations (MW) 507.8

Off-grid

[edit]

List of all power plants in British Columbia serving loads in communities not connected to the Western Interconnection power grid.

Name Location Capacity (MW) Date Owner Type Ref
Ah-Sin-Heek 52°21′35″N 126°42′45″W / 52.35972°N 126.71250°W / 52.35972; -126.71250 (Ah-Sin-Heek) 7.3 BC Hydro Diesel [1]
Anahim Lake 52°28′0″N 125°19′0″W / 52.46667°N 125.31667°W / 52.46667; -125.31667 (Anahim Lake) 3.9 BC Hydro Diesel [1]
Atlin 59°34′28″N 133°41′57″W / 59.57444°N 133.69917°W / 59.57444; -133.69917 (Atlin) 2.7 BC Hydro Diesel [1]
Bella Bella 52°09′52″N 128°8′42″W / 52.16444°N 128.14500°W / 52.16444; -128.14500 (Bella Bella) 4.9 BC Hydro Diesel [1]
Clayton Falls 52°22′13″N 126°48′51″W / 52.37028°N 126.81417°W / 52.37028; -126.81417 (Clayton Falls) 2.0 BC Hydro Hydroelectric [1]
Dease Lake 58°26′20″N 130°0′50″W / 58.43889°N 130.01389°W / 58.43889; -130.01389 (Dease Lake) 3.5 BC Hydro Diesel [1]
Eddontenajon 57°46′18″N 129°58′46″W / 57.77167°N 129.97944°W / 57.77167; -129.97944 (Eddontenajon) 1.7 BC Hydro Diesel [1]
Elhlateese 49°01′14″N 125°02′06″W / 49.02056°N 125.03500°W / 49.02056; -125.03500 (Elhlateese) 0.2 2012 BC Hydro Diesel [1][113]
Good Hope Lake 59°16′55″N 129°18′10″W / 59.28194°N 129.30278°W / 59.28194; -129.30278 (Good Hope Lake) 0.8 2015 BC Hydro Diesel [1][114]
Hartley Bay 53°25′30″N 129°15′07″W / 53.42500°N 129.25194°W / 53.42500; -129.25194 (Hartley Bay) 1.1 BC Hydro Diesel [1][77]
Hluey Lakes Dease Lake 3 1999 Capstone Infrastructure Hydro [115]
Kwadacha 57°25′26″N 125°37′55″W / 57.42389°N 125.63194°W / 57.42389; -125.63194 (Kwadacha) 1.8 BC Hydro Diesel [1][116]
Kwadacha Bioenergy Project 57°25′26″N 125°37′55″W / 57.42389°N 125.63194°W / 57.42389; -125.63194 (Kwadacha) 0.5 Kwadacha Nation Biogas [116][15]
Malibu Hydro Malibu 0.6 2005 Malibu Club Hydro [117]
Masset 54°1′13″N 132°6′48″W / 54.02028°N 132.11333°W / 54.02028; -132.11333 (Masset) 16.5 BC Hydro Diesel [1]
McBride 53°18′23″N 120°10′02″W / 53.30639°N 120.16722°W / 53.30639; -120.16722 (Masset) 5.0 2010 BC Hydro Biodiesel [1][118]
Moresby Lake Generating Station Haida Gwaii 6.6 1990 Atlantic Power Corporation Hydro [119][15]
Ocean Falls Ocean Falls 14 1922 Boralex Hydro

[120]

Pine Creek Atlin 2.1 2009 Taku River Tlingit First Nation Hydro [121][15]
Sandspit 53°14′8″N 131°52′46″W / 53.23556°N 131.87944°W / 53.23556; -131.87944 (Sandspit) 10.2 BC Hydro Diesel [1]
Takla 55°29′00″N 125°58′25″W / 55.48333°N 125.97361°W / 55.48333; -125.97361 (Takla) 0.7 BC Hydro Diesel [1]
Telegraph Creek 57°54′14″N 131°10′18″W / 57.90389°N 131.17167°W / 57.90389; -131.17167 (Telegraph Creek) 1.8 BC Hydro Diesel [1]
Tsay Keh Dene 56°46′37″N 124°56′32″W / 56.77694°N 124.94222°W / 56.77694; -124.94222 (Tsay Keh Dene) 1.1 BC Hydro Diesel [1]
Toad River 58°50′44″N 125°13′22″W / 58.84556°N 125.22278°W / 58.84556; -125.22278 (Telegraph Creek) 0.6 2009 BC Hydro Diesel [1][122]
Total operating stations (MW) 92.6

See also

[edit]

References

[edit]
  1. ^ a b c d e f g h i j k l m n o p q r s t u v w x y z aa ab ac ad ae af ag ah ai aj ak al am an ao ap aq ar as at au av aw ax "Quick Facts For the Year Ended March 31, 2017" (PDF). BC Hydro. Retrieved 29 April 2018.
  2. ^ "Vancouver Island Facilities". BC Hydro. Retrieved 2024-08-21.
  3. ^ BC Hydro (2009-06-17), BC Hydro plans to purchase one-third interest in Waneta Dam, archived from the original on 2011-06-11, retrieved 2010-08-25
  4. ^ Teck Resources Limited (2010-03-05), Teck Announces Waneta Dam Sale Closing, archived from the original on 2010-07-14, retrieved 2010-08-25
  5. ^ "Site C Backgrounder" (PDF). BC Hydro. 23 June 2016. Archived from the original (PDF) on 23 June 2016. Retrieved 29 April 2018.
  6. ^ "BC Hydro purchases remaining interest in Waneta Dam and Generating Station". www.bchydro.com. Archived from the original on 28 January 2019. Retrieved 19 April 2022.
  7. ^ "Fortis and Teck Announce Waneta Dam Agreement".
  8. ^ "Akolkolex". TransAlta Renwables. Retrieved 29 April 2018.
  9. ^ a b c Columbia Power Corporation, Annual Report 2009/10 (PDF), archived from the original (PDF) on 2011-07-23, retrieved 2010-08-25
  10. ^ "Ashlu Creek". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
  11. ^ "Operating Assests [sic]". Synex International Inc. Archived from the original on 2017-07-19. Retrieved 29 April 2018.
  12. ^ "Big Silver Creek". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
  13. ^ "Bone Creek". TransAlta Renewables. Retrieved 29 April 2018.
  14. ^ City of Nelson, B.C., Electrical Services, archived from the original on 2013-04-03, retrieved 2010-08-27
  15. ^ a b c d e f g h i j k l m n o p q r s t u v w x y z aa ab ac ad ae af ag ah ai aj ak al am an ao "Independent Power Producers Currently Supplying power to BC Hydro" (PDF). BC Hydro. Retrieved 7 December 2018.
  16. ^ "Boulder Creek". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
  17. ^ "Box Canyon Hydro". Elemental Energy. Retrieved 29 April 2018.
  18. ^ "Brandywine". Eco Flow Energy. Retrieved 29 April 2018.
  19. ^ "Brown Lake". Innergex Renewable Energy Inc. Retrieved 28 April 2018.
  20. ^ "Canoe Creek Hydro". Canoe Creek. Retrieved 29 April 2018.
  21. ^ "Castle Creek Hydroelectric Project, McBride, BC, Canada - Pelton Turbines". Dependable Turbines Ltd. Archived from the original on 1 July 2017. Retrieved 29 April 2018.
  22. ^ Hupacasath First Nation, Upnit Power Corporation, retrieved 2018-04-28
  23. ^ a b c d Fortis BC, Generation, archived from the original on 2010-11-25, retrieved 2010-08-24
  24. ^ "Culliton Creek Hydro Project". BluEarth Renewables. Retrieved 29 April 2018.
  25. ^ a b Synex International, Energy Projects, retrieved 2010-08-28
  26. ^ a b "Hydro-electric project sold near Terrace, B.C. - Terrace Standard". Terrace Standard. 2 March 2017. Retrieved 29 April 2018.
  27. ^ a b "Dasque-Middle Hydro Facility". BluEarth Renewables. Retrieved 29 April 2018.
  28. ^ "Douglas Creek". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
  29. ^ BC Hydro (2010-03-26), Eagle Lake, archived from the original on 2011-06-11, retrieved 2010-08-28
  30. ^ "East Toba". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
  31. ^ a b "Valemount Hydro Operations" (PDF). Brookfield Power. Archived from the original (PDF) on 2012-03-11.
  32. ^ BC Hydro (2009-03-25), Lake Country's Positive Power, archived from the original on 2011-06-11, retrieved 2010-08-28
  33. ^ "Fire Creek". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
  34. ^ "Fitzsimmons Creek". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
  35. ^ "Furry Creek Hydro Facility". BluEarth Renewables. Retrieved 29 April 2018.
  36. ^ "Forrest Kerr Hydroelectric Facility". AltaGas. Archived from the original on 13 September 2018. Retrieved 29 April 2018.
  37. ^ "Haa-ak-suuk Creek Hydro". Canoe Creek. Retrieved 29 April 2018.
  38. ^ "Hunter Creek Hydro Project". Connor, Clark and Lunn. Retrieved 29 April 2018.
  39. ^ "Jamie Creek Hydroelectric". Boralex. Archived from the original on 30 April 2018. Retrieved 29 April 2018.
  40. ^ "Jimmie Creek". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
  41. ^ Rio Tinto, Power Operations/Watershed Management, retrieved 2018-04-28
  42. ^ "Kokish Hydroelectric". Brookfield Renewable. Archived from the original on 30 April 2018. Retrieved 29 April 2018.
  43. ^ "Kwoiek Creek". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
  44. ^ "Lamont Creek". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
  45. ^ a b Brookfield Energy, Powell River Energy (PDF), archived from the original (PDF) on 2012-03-11, retrieved 2010-08-26
  46. ^ "Long Lake". Regional Power. Retrieved 29 April 2018.[permanent dead link]
  47. ^ "Lorenzetta Creek". Zella Hydro. 9 November 2013. Retrieved 29 April 2018.
  48. ^ a b "Bear Creek". Regional Power. Retrieved 29 April 2018.[permanent dead link]
  49. ^ a b "Clowhom Hydro Facility". BluEarth Renewables. Retrieved 29 April 2018.
  50. ^ Atlantic Power Corporation, Mamquam Power Plant: Squamish, B.C., retrieved 2018-04-28
  51. ^ BC Hydro, Marion 3 Hydro Project, archived from the original on 2011-06-11, retrieved 2010-08-28
  52. ^ "McLymont Creek Hydroelectric Facility". AltaGas. Archived from the original on 30 April 2018. Retrieved 29 April 2018.
  53. ^ "McNair Creek Hydro Facility". BluEarth Renewables. Retrieved 29 April 2018.
  54. ^ "Miller Creek". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
  55. ^ "Montrose Creek". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
  56. ^ Morehead Valley Hydro (December 2009), Morehead Valley Hydro, retrieved 2010-08-26[permanent dead link]
  57. ^ "Northwest Stave River". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
  58. ^ "Pingston Creek Hydro". TransAlta Renwables. Retrieved 29 April 2018.
  59. ^ "Rutherford Creek". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
  60. ^ "Sakwi Creek Hydro Project". Connor, Clark & Lunn. Retrieved 29 April 2018.
  61. ^ Earle, Steven (October 2003), "Sechelt Creek Hydro Project", Malaspina University-College, retrieved 2010-08-27
  62. ^ "Sechelt". Capstone Infrastructure. Retrieved 29 April 2018.
  63. ^ "Silversmith Powerhouse". Balance of Power. Retrieved 29 April 2018.
  64. ^ "Skookum". Eco Flow Energy. Retrieved 29 April 2018.
  65. ^ "Stokke Creek". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
  66. ^ "Tipella Creek". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
  67. ^ "Tretheway Creek". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
  68. ^ "Tyson Creek Hydro Facility". BluEarth Renewables. Retrieved 29 April 2018.
  69. ^ "Upper Lillooet River". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
  70. ^ "Upper Mamquam". TransAlta Renewables. Retrieved 29 April 2018.
  71. ^ "Upper Stave River". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
  72. ^ "Volcano Creek Hydroelectric Facility". AltaGas. Archived from the original on 30 April 2018. Retrieved 29 April 2018.
  73. ^ "Waneta Dam Expansion". FortisBC. Archived from the original on 10 July 2018. Retrieved 29 April 2018.
  74. ^ "Winchie Creek Hydro Grand Opening". 10 July 2018. Retrieved 1 August 2019.
  75. ^ a b c d e f "Independent Power Producers (IPPs) with projects currently in development" (PDF). BCHydro. Retrieved 7 December 2018.
  76. ^ a b c "Narrows Inlet Hydro Project". BluEarth Renewables. Retrieved 29 April 2018.
  77. ^ a b Pollon, Christopher (21 March 2016). "In Hartley Bay, a Four-Decade Fight to Dump Diesel Continues | The Tyee". The Tyee.
  78. ^ a b EnPower Inc., EnPower Open House Info (PDF), archived from the original (PDF) on 2011-07-06, retrieved 2010-08-27
  79. ^ Greater Vancouver Regional District (June 2007), Waste to Energy (PDF), retrieved 2010-08-27
  80. ^ "Wastech opens British Columbia landfill gas plant | Biomassmagazine.com". Biomass Magazine. Retrieved 29 April 2018.
  81. ^ a b c "Current Initiatives". West Fraser. Retrieved 29 April 2018.
  82. ^ Cedar Road LFG, Landfill Biogas, archived from the original on 2011-06-02, retrieved 2010-08-28
  83. ^ "Biomass power stations in Canada", Power Plants Around the World, retrieved 2010-08-29
  84. ^ Mercer International Group, Zellstoff Celgar Mill, retrieved 2010-08-29
  85. ^ "Conifex Power". Conifex. Archived from the original on 30 April 2018. Retrieved 29 April 2018.
  86. ^ "Compressor station's excess heat generates electricity. | TransCanada Corporation Blog". TransCanada. Archived from the original on 30 April 2018. Retrieved 29 April 2018.
  87. ^ a b "Fort St. James, British Columbia". Veolia North America. 3 February 2015. Retrieved 29 April 2018.
  88. ^ "Harvest "Energy Garden"". bcbioenergy.ca. Retrieved 29 April 2018.
  89. ^ "Greater Nanaimo Pollution Control Centre – Co-generation System – IWCD". Retrieved 2020-09-28.
  90. ^ BC Hydro, Harmac Biomass, British Columbia, retrieved 2018-01-08
  91. ^ Maxim Power Corp., Heartland Landfill Project, British Columbia, archived from the original on 2010-11-13, retrieved 2010-08-27
  92. ^ "BC Hydro supports Howe Sound Pulp and Paper's energy efficiency and clean power generation plans". BCHydro. 8 September 2010. Retrieved 29 April 2018.
  93. ^ Maxim Power Corp., Vancouver Landfill Project, British Columbia, archived from the original on 2010-11-13, retrieved 2010-08-27
  94. ^ Atlantic Power Corporation, Williams Lake Power Plant : Williams Lake, B.C., archived from the original on 2012-04-03, retrieved 2011-11-12
  95. ^ "SunMine | Kimberley, BC". SunMine | Kimberley, BC.
  96. ^ "BC Hydro Greenlights Energy Purchase Agreement for Tŝilhqot'in Solar Farm" (PDF). TŜILHQOT’IN NATIONAL GOVERNMENT. Archived from the original (PDF) on 3 May 2020. Retrieved 7 December 2018.
  97. ^ AltaGas, Bear Mountain Wind Park, retrieved 2010-08-22
  98. ^ Sea Breeze Power Corp., Cape Scott Wind Farm, retrieved 2015-02-24
  99. ^ "Dokie 1". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
  100. ^ Grouse Mountain Resort, The Eye of the Wind: Fast Facts, retrieved 2010-08-22
  101. ^ Pattern Energy Group LP, Meikle Wind Construction Brochure (PDF), retrieved 2015-07-23
  102. ^ "Drones film Western Canada's largest wind farm, with 60+ wind turbines - Greentech Media". www.greentechmedia.com. Retrieved 2017-10-24.
  103. ^ "Pattern Energy Completes Acquisition of 51% of 179 MW Meikle Wind Power Facility". www.newswire.ca. Retrieved 2018-05-23.
  104. ^ a b "Welcome to Okanagan Wind | Okanagan Wind". Okanagan Wind. Retrieved 29 April 2018.
  105. ^ Capital Power Corporation, Quality Wind, archived from the original on 2012-12-13, retrieved 2013-01-02
  106. ^ "Wind, hydroelectric, solar and thermal projects | Boralex". www.boralex.com. Archived from the original on 2018-04-29. Retrieved 2018-04-29.
  107. ^ "Moose Lake Wind Farm Commences Commercial Operation April 1, 2019". Aeolis Wind Power Corporation. 2019-07-10. Retrieved 2023-01-01.
  108. ^ "Septimus Creek Wind Power Project | Zero Emission Energy Developments Inc". zeroemissiondevelopments.com.
  109. ^ a b "Thermal Generation". BC Hydro.
  110. ^ "Energy project: Delta, BC". www.houwelings.com.
  111. ^ Capital Power (2010-08-03), Capital Power to acquire Vancouver Island power plant, Edmonton, retrieved 2010-08-22{{citation}}: CS1 maint: location missing publisher (link)[permanent dead link]
  112. ^ ATCO Power, McMahon Cogeneration Plant, retrieved 2010-08-21
  113. ^ "Vancouver Island First Nation celebrates new BC Hydro service". www.bchydro.com. 9 July 2012.
  114. ^ "British Columbia Hydro and Power Authority ~ Application for the Certificate of Public Convenience and Necessity for Jade City and Good Hope Lake Electrification Project ~ Final Order - British Columbia Utilities Commission". www.ordersdecisions.bcuc.com.
  115. ^ "Hluey Lakes". Capstone Infrastructure. Retrieved 29 April 2018.
  116. ^ a b "Wood chips help power Kwadacha First Nation, cutting carbon emissions". www.bchydro.com. Archived from the original on 2018-04-29. Retrieved 2018-04-29.
  117. ^ Malibu Hydro, Malibu Hydro quick Facts, retrieved 2010-08-27
  118. ^ "BC Hydro opens biodiesel generating station in McBride". www.bchydro.com. 18 October 2010.
  119. ^ Atlantic Power Corporation, Moresby Lake Power Plant: Haida Gwaii, B.C., archived from the original on 2012-04-03, retrieved 2011-11-12
  120. ^ Boralex, Ocean Falls Hydroelectric, archived from the original on 2018-04-30, retrieved 2018-04-29
  121. ^ Taylor, Lara (2009-11-09), "The Atlin hydro project – embodying First Nation principles", International Water Power and Dam Construction, archived from the original on 2011-06-14, retrieved 2010-08-28
  122. ^ "Toad River no longer on its own for power". www.bchydro.com. Archived from the original on 2018-04-29. Retrieved 2018-04-29.
[edit]

Licensed under CC BY-SA 3.0 | Source: https://en.wikipedia.org/wiki/List_of_generating_stations_in_British_Columbia
1 |
Download as ZWI file
Encyclosphere.org EncycloReader is supported by the EncyclosphereKSF