Locomotives of the North Staffordshire Railway

From Wikipedia - Reading time: 16 min

The North Staffordshire Railway built or had constructed for it, approximately 350 locomotives. Until the company established Stoke railway works at Stoke-upon-Trent in 1864, a variety of engineering firms supplied locomotives. The company became more self-reliant as time went on, and by the beginning of the 20th century virtually all new engines were produced at Stoke works.

The North Staffordshire Railway became part of the London, Midland and Scottish Railway (LMS) in 1923 and its locomotives were taken into LMS stock. With the engine standardisation policy of the LMS, under the chairmanship of Sir Josiah Stamp, the relatively small number of NSR locomotives made them obvious candidates for early withdrawal and scrapping. Withdrawals started in 1927, and by April 1939 all locomotives in the capital stock had been withdrawn.[1]

Standard gauge locomotives

[edit]
NSR original number
[2][3]
1870 number
[2][3]
Wheel arrangement
[2][3]
Class
[2][3]
Builder
[2][3]
Builder no
[2][3]
Built
[2][3]
LMS number 1923
[2][3]
LMS number 1928
[2][3]
LMS power class 1923
[2][3]
LMS power class 1928
[2][3]
Withdrawn
[2][3]
Notes
[3]
1 1 2-2-2 Sharp Brothers and Company 484 February 1848 April 1891 Named Dragon. Rebuilt as a 2-2-2ST 1866.
2 26 2-2-2 Sharp Brothers and Company 486 March 1848 1882 Rebuilt as a 2-4-0 c.1867.
23 27 2-2-2 Sharp Brothers and Company 549 October 1848 1883 Rebuilt as a 2-4-0 c.1867.
24 81 2-2-2 Sharp Brothers and Company 550 October 1848 1882 Rebuilt as a 2-4-0 c.1867.
27 2 2-2-2 Sharp Brothers and Company 551 October 1848 December 1890 Rebuilt as a 2-2-2ST 1866.
29 29 2-2-2 Sharp Brothers and Company 554 November 1848 1883 Rebuilt as a 2-4-0 c.1867.
5 2-4-0 B. Hick and Son 1848 1868
6 30 2-4-0 B. Hick and Son 1848 1881
7 4 2-4-0 B. Hick and Son 1848 1881 Rebuilt as 2-2-2WT 1851.
8 5 2-4-0 B. Hick and Son 1848 1881 Rebuilt as 2-2-2WT 1851.
3 38 2-4-0 Jones and Potts 1848 1874
4 39 2-4-0 Jones and Potts 1848 1874
9 31 2-4-0 Robert Stephenson and Company 671 1848 1879
10 32 2-4-0 Robert Stephenson and Company 672 1848 1884
11 41 2-4-0 Robert Stephenson and Company 673 1848 1874
12 46 2-4-0 Jones and Potts 1848 1884
13 2-4-0 Robert Stephenson and Company 674 1848 1868
14 44 2-4-0 Jones and Potts 1848 1883
19 33 2-4-0 Robert Stephenson and Company 675 1848 1883
20 42 2-4-0 Robert Stephenson and Company 676 1848 1874
22 34 2-4-0 Jones and Potts 1848 1884
25 45 2-4-0 Jones and Potts 1848 1884
28 35 2-4-0 Robert Stephenson and Company 677 1848 1881
30 6 2-4-0 Kitson, Thompson and Hewitson 176 1848 1878 Rebuilt as 2-4-0T c.1865.
31 7 2-4-0 Kitson, Thompson and Hewitson 177 1848 1874 Rebuilt as 2-4-0T c.1865.
32 8 2-4-0 Kitson, Thompson and Hewitson 178 1848 1878 Rebuilt as 2-4-0T c.1865.
38 40 2-4-0 Jones and Potts 1848 1881
39 43 2-4-0 Jones and Potts 1848 1883
40 36 2-4-0 Jones and Potts 1848 1883
42 37 2-4-0 Jones and Potts 1848 1883
45 9 2-4-0 Kitson, Thompson and Hewitson 179 1849 1874 Rebuilt as 2-4-0T c.1865.
46 10 2-4-0 Kitson, Thompson and Hewitson 180 1849 1874 Rebuilt as 2-4-0T c.1865.
47 11 2-4-0 Kitson, Thompson and Hewitson 181 1849 1874 Rebuilt as 2-4-0T c.1865.
15 64 0-6-0 Vulcan Foundry 279 1848 1873
16 65 0-6-0 Vulcan Foundry 280 1848 1873
17 66 0-6-0 Vulcan Foundry 281 1848 1877
18 67 0-6-0 Vulcan Foundry 282 1848 1875
21 68 0-6-0 Vulcan Foundry 283 1848 1875
26 69 0-6-0 Vulcan Foundry 284 1848 1873
37 70 0-6-0 Vulcan Foundry 285 1848 1873
41 71 0-6-0 Vulcan Foundry 286 1849 1874
43 72 0-6-0 Vulcan Foundry 287 1849 1876
44 73 0-6-0 Vulcan Foundry 288 1850 June 1888
33 76 0-6-0 Robert Stephenson and Company 406 1844 December 1902 Acquired second hand from Grissell & Peto, contractors, 1848.
34 58 0-6-0 Robert Stephenson and Company 422 1844 1881 Acquired second hand from Grissell & Peto, contractors, 1848. Rebuilt as 0-6-0ST and renumbered 42 in June 1866.
35 77 0-6-0 Robert Stephenson and Company 423 1844 December 1902 Acquired second hand from Grissell & Peto, contractors, 1848.
36 59 0-6-0 Robert Stephenson and Company 424 1844 1880 Acquired second hand from Grissell & Peto, contractors, 1848. Rebuilt as 0-6-0ST June 1866.
48 16 2-4-0 Kitson, Thompson and Hewitson 226 1850 1884 Rebuilt as a 2-2-2 1851.
49 17 2-4-0 Kitson, Thompson and Hewitson 227 1850 1882 Rebuilt as a 2-2-2 1851.
50 18 2-4-0 Kitson, Thompson and Hewitson 228 1850 1882 Rebuilt as a 2-2-2 1851.
51 19 2-4-0 Kitson, Thompson and Hewitson 229 1850 1871 Rebuilt as a 2-2-2 1851.
52 20 2-4-0 Kitson, Thompson and Hewitson 230 1850 1883 Rebuilt as a 2-2-2 1851.
53 21 2-4-0 Kitson, Thompson and Hewitson 231 1850 1882 Rebuilt as a 2-2-2 1851.
54 22 2-2-2 Kitson, Thompson and Hewitson 238 1851 1886
55 23 2-2-2 Kitson, Thompson and Hewitson 239 1851 1886
56 24 2-2-2 Kitson, Thompson and Hewitson 240 1851 1886
57 25 2-2-2 Kitson, Thompson and Hewitson 241 1851 1882
58 0-6-0 Robert Stephenson and Company 678 July 1849 1851 Sold to the Midland Railway.
59 0-6-0 Robert Stephenson and Company 679 July 1849 1851 Sold to the Midland Railway.
60 0-6-0 Robert Stephenson and Company 680 August 1849 1851 Sold to the Midland Railway.
61 0-6-0 Robert Stephenson and Company 681 January 1850 1851 Sold to the Midland Railway.
62 0-6-0 Robert Stephenson and Company 682 December 1849 1851 Sold to the Midland Railway.
63 0-6-0 Robert Stephenson and Company 683 1851 1851 Sold to the contractors for the Dutch Rhenish Railway Company.
58 102 0-6-0 Kitson, Thompson and Hewitson 316 1853 November 1897
59 103 0-6-0 Kitson, Thompson and Hewitson 317 1853 1898
60 60 0-6-0 Vulcan Foundry 383 1855 1884 Rebuilt as 0-6-0ST 1870.
61 61 0-6-0 Vulcan Foundry 384 1855 1887 Rebuilt as 0-6-0ST 1870.
62 62 0-6-0 Vulcan Foundry 385 1855 November 1888 Rebuilt as 0-6-0ST 1870.
63 63 0-6-0 Vulcan Foundry 386 1855 1884 Rebuilt as 0-6-0ST 1870.
64 100 0-6-0 Robert Stephenson and Company 1330 1860 October 1896
66 101 0-6-0 Robert Stephenson and Company 1331 1860 March 1897
65 3 2-2-2WT ? ? 1883 Possibly built by Robert Stephenson and Company in 1850. Alternatively possibly purchased from Peto & Leishman, contractors, in 1849.
67 56 0-6-0ST Robert Stephenson and Company 1414 1862 March 1888
68 57 0-6-0ST Robert Stephenson and Company 1415 1862 March 1888
69 78 0-6-0 Hudswell Clarke 35 October 1864 July 1899
70 79 0-6-0 Hudswell Clarke 36 November 1864 December 1898
71 80 0-6-0 Hudswell Clarke 39 January 1865 July 1900
72 81 0-6-0 Hudswell Clarke 40 February 1865 October 1899
73 82 0-6-0 Hudswell Clarke 43 May 1865 June 1907
74 83 0-6-0 Hudswell Clarke 44 June 1865 June 1907
75 84 0-6-0 Neilson and Company 1145 1865 December 1909
76 85 0-6-0 Neilson and Company 1146 1865 December 1909
77 86 0-6-0 Neilson and Company 1147 1865 June 1910
78 87 0-6-0 Neilson and Company 1148 1865 July 1910
79 88 0-6-0 Neilson and Company 1149 1865 December 1909
80 89 0-6-0 Neilson and Company 1150 1865 November 1913
90 90 0-6-0 F (from 1903) Worcester Engine Company 7 1866 December 1910 Allocated to class F after rebuilding.
91 91 0-6-0 F (from 1904) Worcester Engine Company 8 1867 February 1911 Allocated to class F after rebuilding.
92 92 0-6-0 F (from 1901) Worcester Engine Company 9 1867 March 1911 Allocated to class F after rebuilding.
93 93 0-6-0 Worcester Engine Company 10 1867 June 1909
94 94 0-6-0 Worcester Engine Company 11 1867 June 1909
95 95 0-6-0 F (from 1898) Worcester Engine Company 12 1867 June 1909 Allocated to class F after rebuilding.
96 96 0-6-0 Worcester Engine Company 13 1867 May 1913
97 97 0-6-0 F (from 1907) Worcester Engine Company 14 1867 May 1913 Allocated to class F after rebuilding.
98 98 0-6-0 Worcester Engine Company 15 1867 December 1908
99 99 0-6-0 Worcester Engine Company 16 1867 December 1908
82 51 0-6-0ST Hudswell Clarke 77 June 1866 1880
5 52 0-6-0ST Stoke works 1868 1879 First locomotive built by the NSR at its own workshops.
13 53 0-6-0ST Stoke works 1868 1880
24 54 0-6-0ST Stoke works 1868 1882
55 0-6-0ST Isaac Dodds and Son 1865 1882 Acquired in 1870.
74 0-6-0 E Stoke works 1871 2320 8650 1 1F June 1934 Renumbered 74A in 1919.
75 0-6-0 E Stoke works 1871 2321 1 February 1926 Renumbered 75A in 1919.
104 0-6-0 E Vulcan Foundry 642 1872 2322 8651 1 1F December 1932
105 0-6-0 E Vulcan Foundry 643 1872 2323 1 November 1926
106 0-6-0 E Vulcan Foundry 644 1872 2324 8652 1 1F November 1932
107 0-6-0 E Vulcan Foundry 645 1872 2325 1 June 1927
108 0-6-0 E Vulcan Foundry 646 1872 2326 8653 1 1F November 1930
109 0-6-0 E Vulcan Foundry 647 1872 2327 8654 1 1F September 1931
110 0-6-0 E Vulcan Foundry 648 1872 2328 8655 1 1F December 1929
111 0-6-0 E Vulcan Foundry 649 1872 2329 8656 1 1F March 1930
112 0-6-0 E Vulcan Foundry 650 1872 2330 8657 1 1F December 1928
113 0-6-0 E Vulcan Foundry 651 1872 2331 8658 1 1F December 1928
118 0-6-0 E Beyer, Peacock and Company 1348 April 1874 2334 1 August 1927 Renumbered 118A in 1918.
119 0-6-0 E Beyer, Peacock and Company 1349 April 1874 2335 1 December 1926 Renumbered 119A in 1918.
120 0-6-0 E Beyer, Peacock and Company 1350 April 1874 2336 8659 1 1F March 1930 Renumbered 120A in 1918.
121 0-6-0 E Beyer, Peacock and Company 1351 April 1874 2337 1 July 1927 Renumbered 121A in 1918.
122 0-6-0 E Beyer, Peacock and Company 1352 April 1874 2338 8660 1 1F December 1933
123 0-6-0 E Beyer, Peacock and Company 1353 May 1874 2339 8661 1 1F May 1928
67 0-6-0 E Stoke works 1875 2340 8662 1 1F December 1928
68 0-6-0 E Stoke works 1875 2341 8663 1 1F May 1928
72 0-6-0 E Stoke works 1876 1919
66 0-6-0 E Stoke works 1877 2342 8664 1 1F November 1930
19 2-4-0 19 Stoke works 1871 1905
69 0-6-0 69 Sharp, Stewart and Company 2342 1873 1922 Renumbered 69A in 1913.
70 0-6-0 69 Sharp, Stewart and Company 2343 1873 2332 1 May 1927 Renumbered 70A in 1914.
64 0-6-0 69 Sharp, Stewart and Company 2378 1873 1918 Renumbered 64A in 1913.
65 0-6-0 69 Sharp, Stewart and Company 2379 1873 1919 Renumbered 65A in 1913.
114 0-6-0 69 Sharp, Stewart and Company 2424 1874 1920 Renumbered 114A in 1916.
115 0-6-0 69 Sharp, Stewart and Company 2425 1874 1920 Renumbered 115A in 1917.
116 0-6-0 69 Sharp, Stewart and Company 2426 1874 2333 1 September 1926 Renumbered 116A in 1916.
117 0-6-0 69 Sharp, Stewart and Company 2427 1874 1916
7 2-4-0 7 Stoke works 1874 1897 Renumbered 7A in 1895.
10 2-4-0 7 Stoke works 1874 December 1894
71 2-4-0 7 Stoke works 1874 1894
9 2-4-0T 9 Stoke works 1874 1916 Renumbered 9A in 1907.
11 2-4-0T 9 Stoke works 1874 1916 Renumbered 11A in 1907.
12 2-4-0T 9 Sharp, Stewart and Company 2445 1874 1916 Rebuilt as 2-4-2T 1899. Renumbered 12A in 1908.
41 2-4-0T 9 Sharp, Stewart and Company 2446 1874 1916 Rebuilt as 2-4-2T 1899. Renumbered 41A in 1908.
42 2-4-0T 9 Sharp, Stewart and Company 2447 1874 1916 Rebuilt as 2-4-2T 1899. Renumbered 42A in 1908.
38 2-4-0 38 (later C) Stoke works 1874 1912 Became Class C after rebuild in 1893.
39 2-4-0 38 (later C) Stoke works 1874 1912 Became Class C after rebuild in 1892.
13 2-4-0 38 (later C) Dübs and Company 858 1875 1912 Became Class C after rebuild in 1893. Renumbered 13A in 1912.
14 2-4-0 38 (later C) Dübs and Company 859 1875 1919 Became Class C after rebuild in 1888. Renumbered 14A in 1912.
15 2-4-0 38 (later C) Dübs and Company 860 1875 June 1906 Became Class C after rebuild in 1894.
47 0-6-0ST 56 Robert Stephenson and Company 2251 1875 June 1890 Sold to Madeley Coal & Iron Company.
48 0-6-0ST 56 Robert Stephenson and Company 2252 1875 June 1887
49 0-6-0ST 56 Robert Stephenson and Company 2253 1875 June 1885
50 0-6-0ST 56 Robert Stephenson and Company 2254 1875 October 1889
6 2-4-0T A Stoke works 1878 1910 Renumbered 6A in 1910.
8 2-4-0T A Stoke works 1878 1914 Renumbered 8A in 1911.
31 2-4-0T A Stoke works 1879 1921 Renumbered 31A in 1914.
52 2-4-0T A Stoke works 1879 1454 1454 1 1P August 1932 Rebuilt as 2-4-2T 1899.
51 2-4-0T A Stoke works 1880 1914 Renumbered 51A in 1913.
53 2-4-0T A Stoke works 1880 1921 Renumbered 53A in 1914.
35 2-4-0T A Stoke works 1881 1455 1455 1 1P October 1932 Rebuilt as 2-4-2T 1899.
40 2-4-0T A Stoke works 1881 1456 1456 1 1P August 1932 Rebuilt as 2-4-2T 1899.
4 2-4-0T B Stoke works 1881 1921 Renumbered as 4A in 1915.
5 2-4-0T B Stoke works 1881 1922 Renumbered as 5A in 1915.
30 2-4-0T B Stoke works 1881 1920 Renumbered 30A in 1914.
17 2-4-0T B Stoke works 1882 1440 1440 1 1P June 1928 Renumbered 17A in 1920.
18 2-4-0T B Stoke works 1882 1441 1441 1 1P June 1933 Renumbered 18A in 1921.
21 2-4-0T B Stoke works 1882 1457 1457 1 1P August 1932 Rebuilt as 2-4-2T 1901.
22 2-4-0T B Stoke works 1882 1442 1442 1 1P December 1932 Renumbered 22A in 1921. Under the LMS was transferred to the North London Railway for a period of time.
25 2-4-0T B Stoke works 1882 1921 Renumbered 25A in 1921.
26 2-4-0T B Stoke works 1882 1921
28 2-4-0T B Stoke works 1882 1922
27 2-4-0T B Stoke works 1883 1443 1 July 1925 Renumbered 27A in 1922.
29 2-4-0T B Stoke works 1883 1444 1444 1 1P October 1932 Renumbered 29A in 1921.
24 2-4-0T B Stoke works 1886 1458 1458 1 1P January 1934 Rebuilt as 2-4-2T 1901.
23 2-4-0T B Stoke works November 1886 1445 1445 1 1P June 1928 Renumbered 23A in 1922.
48 2-4-0T B Stoke works June 1887 1446 1446 1 1P June 1929 Renumbered 48A in 1923. Under the LMS was transferred to the North London Railway for a period of time.
61 2-4-0T B Stoke works 1887 1459 1459 1 1P August 1934 Rebuilt as 2-4-2T 1900.
2 2-4-0T B Stoke works December 1890 1447 1447 1 1P November 1930 Renumbered 2A in 1923. Under the LMS was transferred to the North London Railway for a period of time.
1 2-4-0T B Stoke works April 1891 1448 1448 1 1P November 1930 Renumbered 1A in 1923.
10 2-4-0T B Stoke works December 1894 1449 1 February 1928 Renumbered 10A in 1923. Withdrawn before renumbered under 1928 scheme.
71 2-4-0T B Stoke works June 1894 1450 1450 1 1P October 1933 Under the LMS was transferred to the North London Railway for a period of time.
7 2-4-0T B Stoke works June 1895 1451 1 February 1928 Under the LMS was transferred to the North London Railway for a period of time. Withdrawn before renumbered under 1928 scheme.
58 0-6-0ST ST Stoke works 1881 1600 1 June 1927 Renumbered 58A in 1899.
59 0-6-0ST ST Stoke works 1880 1601 1601 1 1F November 1930 Renumbered 59A in 1902.
54 2-4-0 C Stoke works 1882 1906 Named John Bramley Moore after NSR deputy chairman at time of construction.
55 2-4-0 C Stoke works 1882 1911 Named Colin Minton Campbell after NSR chairman at time of construction.
45 2-4-0 C Stoke works 1884 1911
46 2-4-0 C Stoke works 1884 1911
3 0-6-0T D Stoke works 1883 1550 1550 2 2F September 1930
20 0-6-0T D Stoke works 1883 1551 1551 2 2F December 1931
33 0-6-0T D Stoke works 1883 1552 1552 2 2F October 1929
36 0-6-0T D Stoke works 1883 1553 1553 2 2F September 1935
37 0-6-0T D Stoke works 1883 1554 1554 2 2F October 1931
43 0-6-0T D Stoke works 1883 1555 1555 2 2F October 1931
44 0-6-0T D Stoke works 1883 1556 1556 2 2F November 1931
16 0-6-0T D Stoke works 1884 1557 1557 2 2F August 1936
32 0-6-0T D Stoke works 1884 1558 1558 2 2F January 1929
34 0-6-0T D Stoke works 1884 1559 1559 2 2F November 1930
60 0-6-0T D Stoke works 1884 1560 1560 2 2F April 1928
63 0-6-0T D Stoke works 1884 1561 1561 2 2F September 1929
49 0-6-0T D Stoke works June 1885 1562 1562 2 2F February 1931
62 0-6-0T D Stoke works November 1885 1563 1563 2 2F September 1929
124 0-6-0T D Stoke works June 1885 1564 1564 2 2F June 1932 Renumbered 124A in 1904.
125 0-6-0T D Stoke works December 1885 1565 1565 2 2F January 1928 Renumbered 125A in 1904.
126 0-6-0T D Stoke works June 1886 1566 1566 2 2F December 1931
127 0-6-0T D Stoke works November 1886 1567 1567 2 2F September 1937
128 0-6-0T D Stoke works June 1887 1568 1568 2 2F April 1928
129 0-6-0T D Stoke works November 1887 1569 1569 2 2F December 1931
57 0-6-0T D Stoke works October 1888 1570 1570 2 2F December 1937
73 0-6-0T D Stoke works June 1888 1571 1571 2 2F August 1929
50 0-6-0T D Stoke works October 1889 1572 1572 2 2F December 1931
56 0-6-0T D Stoke works May 1889 1573 1573 2 2F May 1929
47 0-6-0T D Stoke works March 1890 1574 1574 2 2F June 1929
130 0-6-0T D Stoke works June 1891 1575 1575 2 2F August 1929
131 0-6-0T D Stoke works October 1891 1576 1576 2 2F December 1936
132 0-6-0T D Stoke works December 1891 1577 1577 2 2F June 1929
133 0-6-0T D Stoke works March 1892 1578 1578 2 2F January 1930
134 0-6-0T D Stoke works June 1892 1579 1579 2 2F May 1934
135 0-6-0T D Stoke works September 1892 1580 1580 2 2F October 1931
136 0-6-0T D Stoke works December 1892 1581 1581 2 2F September 1928
137 0-6-0T D Stoke works March 1893 1582 1582 2 2F January 1929
138 0-6-0T D Stoke works June 1893 1583 1583 2 2F August 1936
139 0-6-0T D Stoke works September 1893 1584 1584 2 2F June 1934
140 0-6-0T D Stoke works December 1893 1585 1585 2 2F November 1930
141 0-6-0T D Stoke works March 1894 1586 1586 2 2F October 1931
142 0-6-0T D Stoke works September 1894 1587 1587 2 2F January 1929
143 0-6-0T D Stoke works March 1895 1588 2 November 1927
144 0-6-0T D Stoke works October 1895 1589 1589 2 2F September 1935
145 0-6-0T D Stoke works December 1895 1590 1590 2 2F December 1930
146 0-6-0T D Stoke works March 1896 1591 1591 2 2F April 1932
147 0-6-0T D Stoke works June 1896 1592 1592 2 2F August 1931
148 0-6-0T D Stoke works December 1896 1593 1593 2 2F December 1931
149 0-6-0T D Stoke works May 1897 1594 1594 2 2F March 1930
150 0-6-0T D Stoke works September 1897 1595 1595 2 2F June 1932
151 0-6-0T D Stoke works March 1898 1596 1596 2 2F April 1932
152 0-6-0T D Stoke works October 1898 1597 1597 2 2F August 1936
153 0-6-0T D Stoke works April 1899 1598 1598 2 2F October 1929
100 0-6-0 100 Stoke works October 1896 2347 8669 2 2F September 1931
101 0-6-0 100 Stoke works March 1897 2348 8670 2 2F December 1928
102 0-6-0 100 Stoke works November 1897 2349 8671 2 2F April 1929
103 0-6-0 100 Stoke works June 1898 2350 8672 2 2F December 1928
79 0-6-0 100 Stoke works December 1898 2344 8666 2 2F September 1929
78 0-6-0 100 Stoke works July 1899 2346 8668 2 2F September 1931
81 0-6-0 100 Stoke works October 1899 2343 8665 2 2F December 1928
80 0-6-0 100 Stoke works July 1900 2345 8667 2 2F April 1929
82 0-6-0 New 100 Stoke works June 1907 2357 8679 2 2F September 1929
83 0-6-0 New 100 Stoke works June 1907 2358 8680 2 2F December 1928
58 0-6-2T DX Stoke works December 1899 2234 2234 2 2F November 1929
154 0-6-2T DX Stoke works March 1900 2235 2235 2 2F March 1929
155 0-6-2T DX Stoke works December 1900 2236 2236 2 2F July 1929
156 0-6-2T DX Stoke works May 1902 2238 2238 2 2F September 1931
157 0-6-2T DX Stoke works December 1902 2239 2 November 1927
158 0-6-2T DX Stoke works September 1902 2237 2237 2 2F June 1929
114A 0-6-0 Special DX Crewe works 513 October 1861 1913 Purchased April 1900 from LNWR. Previously LNWR 3496.
115A 0-6-0 Special DX Crewe works 1261 April 1869 1915 Purchased April 1900 from LNWR. Previously LNWR 3404.
116A 0-6-0 Special DX Crewe works 431 March 1860 1914 Purchased May 1900 from LNWR. Previously LNWR 3399.
117A 0-6-0 Special DX Crewe works 569 August 1862 1914 Purchased May 1900 from LNWR. Previously LNWR 3402.
159 0-6-0 159 Nasmyth Wilson 588 December 1900 2351 8673 2 2F October 1936
160 0-6-0 159 Nasmyth Wilson 589 December 1900 2352 8674 2 2F November 1933
161 0-6-0 159 Nasmyth Wilson 590 December 1900 2353 8675 2 2F February 1936
162 0-6-0 159 Nasmyth Wilson 591 December 1900 2354 8676 2 2F August 1929
163 0-6-0 159 Nasmyth Wilson 592 December 1900 2355 8677 2 2F September 1936
164 0-6-0 159 Nasmyth Wilson 593 December 1900 2356 8678 2 2F March 1934
165 0-6-2T L Vulcan Foundry 1891 December 1903 2242 2242 3 3F August 1935
166 0-6-2T L Vulcan Foundry 1892 December 1903 2243 2243 3 3F January 1933
167 0-6-2T L Vulcan Foundry 1893 December 1903 2244 2244 3 3F May 1935
168 0-6-2T L Vulcan Foundry 1894 December 1903 2245 2245 3 3F August 1934
169 0-6-2T L Vulcan Foundry 1895 November 1903 2241 2241 3 3F February 1936 Renumbered 125 in 1904.
170 0-6-2T L Vulcan Foundry 1896 November 1903 2240 2240 3 3F September 1935 Renumbered 124 in 1904.
R.M.1 0-2-2T Railmotor Beyer, Peacock and Company 4643 June 1905 June 1927 Not allocated LMS number or power classification.
R.M.2 0-2-2T Railmotor Beyer, Peacock and Company 4644 June 1905 June 1927 Not allocated LMS number or power classification.
R.M.3 0-2-2T Railmotor Beyer, Peacock and Company 4793 December 1905 June 1927 Not allocated LMS number or power classification.
19 2-4-0 19 Stoke works July 1905 1920
15 2-4-0 19 Stoke works June 1906 1920
54 2-4-0 19 Stoke works 1906 1920 Last 2-4-0 built for a standard gauge railway in England.[4]
9 0-4-4T M Stoke works December 1907 1431 1431 3 3P January 1936
11 0-4-4T M Stoke works December 1907 1432 1432 3 3P October 1935
12 0-4-4T M Stoke works January 1908 1433 1433 3 3P October 1935
41 0-4-4T M Stoke works March 1908 1434 1434 3 3P March 1939
42 0-4-4T M Stoke works March 1908 1435 1435 3 3P August 1930
98 0-6-2T New L Stoke works December 1908 2246 2246 3 3F May 1936
99 0-6-2T New L Stoke works December 1908 2247 2247 3 3F February 1928
156 0-6-2T New L Stoke works November 1908 2248 2248 3 3F June 1937
157 0-6-2T New L Stoke works November 1908 2249 2249 3 3F March 1936
93 0-6-2T New L Stoke works June 1909 2250 2250 3 3F July 1934
94 0-6-2T New L Stoke works June 1909 2251 2251 3 3F July 1936
95 0-6-2T New L Stoke works June 1909 2252 2252 3 3F April 1934
158 0-6-2T New L Stoke works June 1909 2253 2253 3 3F March 1936 Sold to the Longmoor Military Railway.
51 0-6-2T New L Stoke works April 1913 2254 2254 3 3F April 1934
64 0-6-2T New L Stoke works November 1913 2255 2255 3 3F May 1936
65 0-6-2T New L Stoke works November 1913 2256 2256 3 3F May 1935
69 0-6-2T New L Stoke works November 1913 2257 2257 3 3F May 1937 Sold to Manchester Collieries
89 0-6-2T New L Stoke works November 1913 2258 2258 3 3F June 1934
96 0-6-2T New L Stoke works May 1913 2259 2259 3 3F October 1936
97 0-6-2T New L Stoke works May 1913 2260 2260 3 3F June 1934
172 0-6-2T New L Stoke works June 1913 2261 2261 3 3F February 1937
72 0-6-2T New L Stoke works 1920 2262 2262 3 3F January 1937 Sold to Manchester Collieries
18 0-6-2T New L Stoke works 1921 2263 2263 3 3F October 1936
22 0-6-2T New L Stoke works 1921 2264 2264 3 3F June 1936 Sold to Manchester Collieries
25 0-6-2T New L Stoke works 1921 2265 2265 3 3F July 1936
26 0-6-2T New L Stoke works 1921 2266 2266 3 3F December 1936
29 0-6-2T New L Stoke works 1921 2267 2267 3 3F April 1935
27 0-6-2T New L Stoke works 1922 2268 2268 3 3F January 1936
28 0-6-2T New L Stoke works 1922 2269 2269 3 3F December 1934 Came into service after grouping.
1 0-6-2T New L Stoke works 1923 2270 2270 3 3F October 1937 Came into service after grouping. Sold to Manchester Collieries.
2 0-6-2T New L Stoke works 1923 2271 2271 3 3F October 1937 See notes section below [a]
10 0-6-2T New L Stoke works 1923 2272 2272 3 3F July 1935 Came into service after grouping.
48 0-6-2T New L Stoke works 1923 2273 2273 3 3F February 1937 Came into service after grouping.
84 0-6-0 H Stoke works December 1909 2359 8681 3 3F January 1930
85 0-6-0 H Stoke works December 1909 2360 8682 3 3F May 1929
88 0-6-0 H Stoke works December 1909 2361 8683 3 3F May 1928
169 0-6-0 H Stoke works December 1909 2362 8684 3 3F November 1928
86 4-4-0 G Stoke works June 1910 595 5410 3 3P April 1929
170 4-4-0 G Stoke works June 1910 597 5412 3 3P December 1928
171 4-4-0 G Stoke works July 1910 598 5413 3 3P May 1933
87 4-4-0 G Stoke works July 1910 596 5411 3 3P June 1929
6 0-6-0 H1 Stoke works December 1910 2363 8685 3 3F January 1929
90 0-6-0 H1 Stoke works December 1910 2364 8686 3 3F December 1929
91 0-6-0 H1 Stoke works February 1911 2365 8687 3 3F January 1930
92 0-6-0 H1 Stoke works March 1911 2366 8688 3 3F October 1930
8 4-4-2T K Stoke works November 1911 2180 2180 3 3P December 1933
45 4-4-2T K Stoke works November 1911 2181 2181 3 3P January 1934
46 4-4-2T K Stoke works December 1911 2182 2182 3 3P January 1934
55 4-4-2T K Stoke works December 1911 2183 2183 3 3P December 1933
13 4-4-2T K Stoke works June 1912 2184 2184 3 3P May 1935
14 4-4-2T K Stoke works June 1912 2185 2185 3 3P December 1933
39 4-4-2T K Stoke works September 1912 2186 2186 3 3P December 1933
38 4-4-0 KT Stoke works October 1912 599 5414 3 3P August 1928
30 0-6-4T New C Stoke works July 1914 2040 2040 5 5F April 1934
31 0-6-4T New C Stoke works July 1914 2041 2041 5 5F March 1935
53 0-6-4T New C Stoke works August 1914 2042 2042 5 5F May 1935
70 0-6-4T New C Stoke works September 1914 2043 2043 5 5F October 1935
173 0-6-4T New C Stoke works December 1914 2044 2044 5 5F March 1936
174 0-6-4T New C Stoke works December 1914 2045 2045 5 5F May 1934
4 0-6-4T New C Stoke works April 1915 2046 2046 5 5F November 1937
5 0-6-4T New C Stoke works April 1915 2047 2047 5 5F March 1934
114 0-6-4T New F Stoke works October 1916 2048 2048 4 4P July 1934
116 0-6-4T New F Stoke works October 1916 2050 2050 4 4P February 1935
117 0-6-4T New F Stoke works December 1916 2051 2051 4 4P November 1935
115 0-6-4T New F Stoke works February 1917 2049 2049 4 4P July 1934
118 0-6-4T New F Stoke works 1918 2052 2052 4 4P October 1936
119 0-6-4T New F Stoke works 1918 2053 2053 4 4P April 1935
120 0-6-4T New F Stoke works 1919 2054 2054 4 4P January 1936
121 0-6-4T New F Stoke works 1919 2055 2055 4 4P August 1934
1 Bo Battery Electric Stoke works 1917 March 1963 See notes section below[b]
74 0-6-0T KS Kerr, Stuart and Company 4079 1919 1602 1602 1 1F October 1932
75 0-6-0T KS Kerr, Stuart and Company 4080 1919 1603 1603 1 1F April 1933
15 0-4-4T New M Stoke works 1920 1436 1436 3 3P April 1939 Last NSR engine in capital stock to be withdrawn.[8]
17 0-4-4T New M Stoke works 1920 1437 1437 3 3P July 1935
19 0-4-4T New M Stoke works 1920 1438 1438 3 3P January 1936
54 0-4-4T New M Stoke works 1920 1439 1439 3 3P 1931
23 0-6-0T 4 Cylinder D Stoke works 1922 2367 8689 3 3P December 1928 Originally allocated LMS number 1599 but rebuilt as 0-6-0 and renumbered 2367

Engines renumbered with "A" as a suffix to the number were said to be on the duplicate list. The duplicate list comprised engines coming towards the end of their working lives and allowed the numbers to be freed up for use by new stock and in many cases to allow classes of new engines to be numbered in consecutive series.

Narrow gauge locomotives

[edit]
Number
[2][3]
Name
[2][3]
Wheel arrangement
[2][3]
Gauge
[2][3]
Builder
[2][3]
Builder no
[2][3]
Built
[2][3]
Withdrawn
[2][3]
Notes[3]
Frog 0-4-0ST 3 ft 6 in (1,067 mm) H. Hughes & Co 1877 May 1936 Operated the tramway at Caldon Low Quarries, the quarries were owned by the NSR.
Toad 0-4-0ST 3 ft 6 in (1,067 mm) H. Hughes & Co 1877 May 1936
Bobs 0-4-0ST 3 ft 6 in (1,067 mm) W. G. Bagnall August 1901 May 1936
1 E. R. Calthrop 2-6-4T 2 ft 6 in (762 mm) Kitson and Company 4258 June 1904 December 1936 Built for the Leek and Manifold Valley Light Railway operated by the NSR. E. R. Calthrop was the engineer of the line. First locomotives of this wheel arrangement to run in Britain.[9]
2 J. B. Earle 2-6-4T 2 ft 6 in (762 mm) Kitson and Company 4257 May 1904 February 1935 Built for the Leek and Manifold Valley Light Railway. J. B. Earle was the resident engineer of the line.

Preservation

[edit]

Two NSR locomotives are preserved. NSR No. 2, an 0-6-2T New L class (one of the four constructed in 1923) and the battery electric locomotive. Both formed part of the national collection at the National Railway Museum[10] but in 2016 ownership of the New L class locomotive was transferred to the Foxfield Railway where the locomotive is now on display.[11]

Notes

[edit]
  1. ^ Came into service after grouping. Sold to Manchester Collieries. Last NSR locomotive of any kind to remain in service, subsequently preserved as part of the National Railway Museum collection. From 2016 in the care of the Foxfield Railway Trust and in storage with a view to restoration at the Foxfield Railway.[5]
  2. ^ Not allocated LMS number or power classification. Considered to be part of the departmental stock by the LMS.[6] Renumbered BEL 2 by British Railways. Last NSR locomotive of any kind to remain in service, now preserved as part of the National Railway Museum collection.[7]

References

[edit]

Notes

[edit]
  1. ^ Christiansen & Miller 1971, p. 262.
  2. ^ a b c d e f g h i j k l m n o p q r s t Hopkins 1986.
  3. ^ a b c d e f g h i j k l m n o p q r s t u v Christiansen & Miller 1971.
  4. ^ Hopkins 1986, p. 54.
  5. ^ "NSR New L No 2". 25 April 2016. Retrieved 28 April 2016.
  6. ^ Essery & Jenkinson 1981, p. 3.
  7. ^ "NSR Battery Locomotive". National Railway Museum. Retrieved 19 June 2011.
  8. ^ Essery & Jenkinson 1985, p. 148.
  9. ^ Hopkins 1986, p. 83.
  10. ^ "NRM Collections: Locomotives". York: National Railway Museum. 2009. Retrieved 13 May 2009.
  11. ^ "NSR New L No 2". 25 April 2016. Retrieved 28 April 2016.

Sources

[edit]
  • Christiansen, Rex & Miller, Robert William (1971). The North Staffordshire Railway. Newton Abbot, Devon: David & Charles. ISBN 0-7153-5121-4.
  • Essery, Bob & Jenkinson, David (1981). An Illustrated History of L.M.S. Locomotives. Volume One: General Review and Locomotive Liveries. Oxford: Oxford Publishing Co. ISBN 0-86093-087-4.
  • Essery, Bob & Jenkinson, David (1985). An Illustrated History of L.M.S. Locomotives. Volume Two: Absorbed Pre-Group Classes Western and Central Divisions. Oxford: Oxford Publishing Co. ISBN 0-86093-264-8.
  • Hopkins, Ken (1986). North Staffordshire Locomotives:An Illustrated History. Burton on Trent: Trent Valley Publications. ISBN 0-948131-14-4.

Licensed under CC BY-SA 3.0 | Source: https://en.wikipedia.org/wiki/Locomotives_of_the_North_Staffordshire_Railway
1 |
Download as ZWI file
Encyclosphere.org EncycloReader is supported by the EncyclosphereKSF