Netaji Subhash Chandra Bose International Airport (IATA: CCU, ICAO: VECC) is an international airport serving the city of Kolkata and the Kolkata metropolitan area. It is the primary aviation hub for eastern and northeastern India. It is located approximately 15 km (9.3 mi) from the city centre. The airport is locally known as Kolkata Airport and Dum Dum Airport before being renamed in 1995 after Subhas Chandra Bose, one of the most prominent leaders of the Indian independence movement. The airport's IATA code CCU is associated with "Calcutta", the former legal name of the city. Opened in 1924, Kolkata Airport is one of the oldest airports in India.
Netaji Subhas Chandra Bose International Airport was founded in the early 1900s as the Calcutta Aerodrome.[4] The airport traditionally served as a strategic stopover on the air route from North America and Europe to Indochina and Australia.[citation needed]Dakota 3 was the first aircraft to land in the airport.[5] In 1924, KLM began scheduled stops at Calcutta, as part of their Amsterdam to Batavia (Jakarta) route.[6][7][8] The same year, a Royal Air Force aircraft landed in Calcutta as part of the first round-the-world expedition by any air force.[9][10][11]
The airport began as an open ground next to the Royal Artillery Armoury in Dum Dum.[11][12][13][14] Sir Stanley Jackson, Governor of Bengal, opened the Bengal Flying Club at Dum Dum/Calcutta aerodrome in February 1929.[15] In 1930, the airfield was made fit for use throughout the year,[16] and other airlines began to utilise the airport. Air Orient began scheduled stops as part of a Paris to Saigon route[17] and Imperial Airways began flights from London to Australia via Calcutta in 1933, thus drew many airlines to Calcutta Airport.[8][18][19] Many pioneering flights passed through the airport, including Amelia Earhart's in 1937.[20][21][22]
Due to the introduction of longer-haul aircraft and the poor political climate of Calcutta during the 1960s, several airlines discontinued their service to the airport. The 1971 Bangladesh Liberation War saw a large increase of both refugees and disease in Calcutta, causing more airlines to cease services to the city. In 1975, the airport opened the first dedicated cargo terminal in India.[38]
The 1990s saw new growth for Calcutta Airport, as the Indian aviation industry saw the arrival of new airlines such as Jet Airways and Air Sahara. A new domestic terminal named Terminal 2 was opened in 1995 making the international one Terminal 1, and the airport was renamed in honour of Netaji Subhas Chandra Bose. In 2000, a new international arrival hall was opened.[5][39]
2005 saw the growth of low-cost carriers in the Indian aviation sector, with new airlines including SpiceJet, IndiGo, and Kingfisher Airlines. This led to a dramatic rise in passenger numbers at the airport. Overcrowding in both terminals led to the implementation of a comprehensive modernisation plan for the airport.[40][41][42]
Work included an expansion of runway 01L/19R, rapid-exit taxiways and parking bays. The runway was extended by 400 metres (0.25 mi) (2790 metres to 3190 metres) on the northern side and 1,000 feet (300 m) on the southern side and was fitted with CAT-I facilities for night use. A 119-year-old mosque that lies 30 metres from the runway' northern end prohibits further expansion in this direction.[43] The longer runway, 01R/19L, was upgraded from CAT-I to CAT-II ILS status to allow landings in poor visibility. In August 2014, it was announced that the instrument landing system of the primary runway would be upgraded to CAT-IIIb. This allows flights to operate till visibility drops below 50 metres. The secondary runway would be upgraded to CAT-II. The ₹120 crore (equivalent to ₹141 crore or US$17 million in 2023) upgrading work started in February 2015[44][45] and was completed in January 2018.[46]
The modernisation plan included some improvements of the airport's existing terminals, including the addition of extra ticketing counters, check-in kiosks, and cafes to the domestic terminal in 2009. However, the need to replace the airport's terminals entirely led to plans for a new integrated terminal, known as T2 to differentiate it from the older domestic block, to serve both international and domestic destinations. A Thai-based company, the Italian-Thai Development (ITD) Corporation (ITD-ITDCem JV, a consortium of ITD and ITD Cementation) and the 125-year-old iconic Project Management Consultant–Parsons Brinckerhoff (PB) was hired with Delhi-based designer Sikka Associates Architects to construct the building. Construction commenced in November 2008, and T2 was inaugurated on 20 January 2013 after overshooting the previous deadlines of July 2011 and August 2012.[47][48] The former airport hotel 'Ashok' was demolished to give way for two new five-star luxury hotels and a shopping mall in its place.[39][49]
Commercial operations were intended to start on 23 January 2013, the 116th birth anniversary of Netaji Subhas Chandra Bose.[50] However, the shift to the new terminal was only completed on 16 March 2013.[51]Airports Council International named it the best improved airport in the Asia-Pacific region in 2014 and 2015.[52][53][54][55]
Netaji Subhash Chandra Bose International Airport has two parallel runways, the primary runway 01R/19L has a capacity of approximately 35 flights per hour and the secondary runway 01L/19R has a capacity of 15 flights per hour. The secondary runway is usually used as a taxiway when the main runway is used. When the primary runway is shut down for maintenance purposes, the secondary runway is used.[56][57]
The airport's new integrated terminal T2 is spread over 233,000 m2 (2,510,000 sq ft) and can handle 25 million passengers annually, compared to the previous terminal T1's capacity of five million. The terminal is an L-shaped structure, containing six levels. It contains 128 check-in counters that utilise CUTE (Common User Terminal Equipment) technology and has 78 immigration counters and twelve customs counters.[61] Passenger lounges are provided by Air India. The terminal is equipped with 18 aerobridges and a further 57 remote parking bays. There are plans to construct an 18-foot bronze statue of Netaji Subhas Chandra Bose in the integrated terminal complex.[62][63]
Kolkata's old international and domestic terminals closed permanently when the integrated terminal opened. However, there were plans to renovate the old international terminal to be used for future hajj services, while the domestic terminal could be used by regional airlines. An earlier proposal of continuing low-cost carrier operations from the existing domestic terminal has been shelved due to the need to fully utilise the new integrated terminal's capacity, making it the first airport in India to shift even its low-cost domestic airlines to the new integrated building upon completion.[51][64][65] However, the old terminal will be replaced by a new terminal T3 to increase the overall capacity.[66]
In the financial year from April 2011 to March 2012, Kolkata Airport served 10.3 million passengers, 85% which were travelling domestically.[67] The withdrawal of Lufthansa's service to Frankfurt in March 2012 left Kolkata with no direct connections beyond Asia.[68] However, other international operations increased in 2012.[67] The new terminal has attracted some airlines to expand their route networks to include Kolkata.[69][70]
In September 2012, the Airports Authority of India upgraded the airport's cargo-handling capacity, enabling it to cater for the demand until 2015–16. There has been a 25 per cent growth in international cargo movement to and from Kolkata Airport and a 15 per cent increase in outward transit. Automobile parts accounted for the bulk of the growth in the movement of cargo from the city to other countries. In November 2008 the first Centre for Perishable Cargo (CPC) in West Bengal was opened at the airport. The CPC has an area of 742.5 m2 (7,992 sq ft) and an annual storage capacity of 12,000 million tonnes. The CPC had been undergoing trials that started in June 2008 and were built with a ₹6.75 crore (equivalent to ₹7.9 crore or US$950,000 in 2023) grant-in-aid from the Agricultural and Processed Food Products Export Development Authority (APEDA) part of the Commerce Ministry.[71] The volume of export was 21,683 tonnes in 2008–09, during the current fiscal more than 23,042 tonnes of cargo were handled by the airport. Similarly, the volume of import cargo increased from 16,863 tonnes to 18,733 tonnes, increasing over ten per cent during the same period. However, in 2008–09 the total volume of cargo handled by the airport declined by 4.8% from the previous year.
The construction of terminal T2, as well as runway expansion, marked the end of Phase 1 of the project. AAI officials have announced that they are prepared to execute Phase 2 of the Kolkata Airport expansion plan. This involves the construction of a new ATC Tower to provide controllers with a better view of the planes at the new terminal. The building will be accompanied by a 4-storey office complex.[73][74] Initially, a 112-meter tower was proposed, but the height has been revised multiple times and in 2017 it was decreased to 51.4 meter.[75] The under-construction tower is expected to be complete by late 2023 and will replace the older one constructed in 1972.[76] By July 2024, the construction of the ATC was completed but the installation of all necessary equipment was due.[66]
The new terminal T2 inaugurated in 2013 is on the verge of reaching its annual capacity of 26 million passengers four years ahead of the initial projections. To tackle this, AAI has planned to upgrade and expand the airport and increase its passenger capacity by construction of another terminal T1 to handle up to 33 million passengers annually. The new terminal will come up north of the current integrated terminal T2. The new ₹5,000 crore expansion plan will be carried out in two phases over a span of six years. The number of parking bays will be increased to 105 by 2024. Additionally the existing terminal is undergoing an interim expansion of ₹130 crore which will see the terminal handle an additional 2 million passengers annually, bringing the total handling capacity of the existing terminal to 28 million passengers annually.[77][78][79][66]
Airport officials said as per the first phase of the expansion plan, the old domestic terminal T1 will be demolished and a 7000 sq. m. new building will be constructed in the area. The building will be linked with the existing terminal of the airport with the help of walkalators and would also have walk-in gates on the ground floor. This building will be used only for boarding and de-boarding of passengers. Passengers arriving in the boarding building would take the connecting bridge to the terminal and then leave the airport. This would reduce peak-hour congestion when several flights do not get enough apron space. This would immediately increase the passenger capacity by a few million and would solve the space crunch for the time being.[78][80] The new building will be U-shaped where the rectangular section (the location of parking lot of old terminal) will host the check-in counters, security check portals and baggage handling facilities. The two arms (one each at the northern and southern end) will function as concourse and will host operational area, house boarding gates and aerobridges. The rectangular section and southern arm will be built as part of the phase 1. The phase 1 expansion plan has been sanctioned by AAI.[66]
The phase 2 of the is yet to receive approval from the aviation ministry. In this phase, the old Air Traffic Navigation Building will be demolished to make way for the northern concourse of the new terminal as mentioned above. The construction of new hangars and bays is also part of the current expansion plan.[80][78][66]
As of the financial year 2019–20, Netaji Subhas Chandra Bose International Airport was again the fifth-busiest airport in India in terms of the total number of passengers served and with respect to the number of flights departing and arriving at the airport, which was about 22 million and 430 flights a day respectively. This was a 0.6% increase from the previous year. Out of which, 19 million passengers were domestic travellers and 3 million were international travellers.[121] The cargo traffic saw a decline of 1.1% from its previous year, with 153,468 metric tonnes of cargo.[122]
Graphs are unavailable due to technical issues. There is more info on Phabricator and on MediaWiki.org.
Annual passenger traffic at CCU airport.
See Wikidata query.
The airport has a well-established facility of prepaid taxis and air-conditioned buses connecting it to the city centre. Ride-hailing services including Uber and Ola operate here regularly. As part of the larger modernisation programme, a flyover at Nagerbazar and an entry ramp on VIP Road have also been constructed. A 2 kilometres (1.2 mi) flyover from Kestopur to Raghunathpur (near Tegharia) was built to speed up airport-bound traffic. These reduced journey times to the airport.[147][148] Parking facilities at the new terminal include two underground parking levels accommodating 3000 cars, as well as an outdoor car parking which can handle an additional 2000 cars.[149][150][151]
In 2014 and 2015, the airport won the title of Best Improved Airport in the Asia-Pacific region awarded by the Airport Council International. The airport was awarded the Best Airport by Hygiene Measures in the Asia-Pacific in 2020 by Airports Council International.[157]
On 2 May 1953, BOAC Flight 783de Havilland Comet bound for Delhi crashed after takeoff from Calcutta Airport with the loss of 43 lives. Parts of the aircraft were found spread over an area of 8 km², near Jugalgari, a village some 25 miles north-west of Calcutta, suggesting disintegration before impact with the ground.[158]
On 12 June 1968, a Pan-Am Flight (N798PA, named Clipper Caribbean) Boeing 707-321C struck a tree 1128 m short of the runway during a night-time visual approach in rain. The aircraft subsequently crashed and caught fire. The fuselage remained largely intact, although the aircraft's landing gear broke off. Out of the 10 crew and 53 passengers aboard, 1 crew member and 5 passengers suffered fatal injuries due to the fire.[159][160]
On 22 December 2015, a Jet Airways bus slammed into the side of an Air India RegionalATR 42-500 aircraft. There were no fatalities. An investigation revealed that the driver was sleeping.[161][162]