Queen Elizabeth Driveway

From Wikipedia - Reading time: 9 min

Queen Elizabeth Driveway
Map
Queen Elizabeth Driveway highlighted in red
Queen Elizabeth Driveway.JPG
Looking east along Dow's Lake
Route information
Maintained by National Capital Commission
Length5.7 km (3.5 mi)
Major junctions
South endPreston Avenue
North endLaurier Avenue
Location
CountryCanada
ProvinceOntario
Major citiesOttawa
Highway system
(in alphabetical order)
Queen Elizabeth Driveway


Queen Elizabeth Driveway is a scenic parkway in Ottawa, Ontario, Canada.

Route Description

[edit]

The parkway runs along the western edge of the Rideau Canal, from Laurier Avenue in the north to Dow's Lake where it turns into Prince of Wales Drive at Preston Avenue.[1] Along the entire length of the Drive is a multi-use trail as part of the Capital Pathway system.

History

[edit]

It is administered and owned by the National Capital Commission (NCC).

The parkway was one of the first projects of the NCC. The NCC replaced the Federal District Commission (FDC), which had been created in 1927, and the even earlier Ottawa Improvement Commission.[2] The two-lane road replaced the industrial buildings and private boathouses that had stood along the canal. The drive was lined with trees and gardens, and a series of large houses were built along it. It was originally known as the Government Driveway but was soon renamed the Rideau Canal Driveway.[citation needed] Several decades later it was given its current name. The speed limit for most of its length is 60 km/h (37 mph).

In the 1950s a similar route was created on the eastern edge of the canal, the Colonel By Drive.

Portions of the parkway are regularly closed to vehicular traffic in the summer months for active use such as cycling. This sparked major debate in 2023, with city councilors and Ottawa mayor Mark Sutcliffe calling on the NCC to reopen the parkway to vehicular traffic in whole or in part, citing traffic and safety concerns. City of Ottawa data has shown that the closure of the parkway leads to increased traffic on O'Connor Street.[3] Despite the pushback, the NCC has continued this initiative in 2024 and is exploring the feasibility of installing bicycle lanes on the parkway.[4]

See also

[edit]

References

[edit]
  1. ^ Vlasveld, Mike (Jan 30, 2020). "Winterlude road closures mainly on Queen Elizabeth Driveway and Gatineau's Laurier Street". ottawamatters.com. Retrieved February 6, 2020.
  2. ^ "Brown's Inlet and the Driveway of the Southwest Glebe". Heritage Ottawa. Retrieved June 22, 2017.
  3. ^ Pringle, Josh (2023-09-28). "Drivers, active-users split on future of Queen Elizabeth Driveway, poll finds". CTV News Ottawa. Retrieved 2024-05-18.
  4. ^ "Portion of Queen Elizabeth Driveway to be completely vehicle-free this summer, NCC says". Ottawa Citizen. 2024-04-23. Retrieved 2024-05-17.
KML is from Wikidata

Licensed under CC BY-SA 3.0 | Source: https://en.wikipedia.org/wiki/Queen_Elizabeth_Driveway
8 views |
Download as ZWI file
Encyclosphere.org EncycloReader is supported by the EncyclosphereKSF