Quzhou–Ningde railway

From Wikipedia - Reading time: 4 min

Quzhou–Ningde railway
Overview
StatusOperational
Termini
Stations13
Service
TypeHeavy rail
History
Opened27 September 2020
Technical
Line length379 km (235 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification50 Hz 25,000 V
Operating speed160 km/h (99 mph)

The Quzhou–Ningde railway is a single-track electrified railway in China. The combined passenger and freight line is 379 kilometres (235 mi) long and has a design speed of 160 kilometres per hour (99 mph). The journey time is 5 hours and 27 minutes.[1]

History

[edit]

Initially, the railway was expected to begin construction in 2011 and to have double-track with a line-speed of 200 kilometres per hour (120 mph).[2] Construction on a single-track railway began in 2015. The line began operation on 27 September 2020.[1]

Stations

[edit]

The line has the following passenger stations:[1]

References

[edit]
  1. ^ a b c "衢宁铁路9月27日开通运营 浙闽8县市结束不通铁路历史 - 南平新闻 - 东南网". np.fjsen.com. Retrieved 2020-10-01.
  2. ^ "浙江福建明年开建"衢宁铁路"(图)_网易新闻中心". 2014-11-07. Archived from the original on 2014-11-07. Retrieved 2020-10-01.



Licensed under CC BY-SA 3.0 | Source: https://en.wikipedia.org/wiki/Quzhou–Ningde_railway
8 views |
Download as ZWI file
Encyclosphere.org EncycloReader is supported by the EncyclosphereKSF