Torre Triana – Torreblanca | |
---|---|
Overview | |
Status | In planning phase |
Locale | Seville |
Stations | 18 |
Service | |
Type | Rapid transit |
System | Seville Metro |
History | |
Opened | TBD |
Technical | |
Line length | 13,57 km |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
The Line 2 of the Metro of Seville will span the city from east to west, connecting the neighbourhoods of La Cartuja and Torreblanca.
Line 2 is still in the planning phase. Through a tunnel, it will travel the city from east to west. The line will begin in the neighbourhood of Torreblanca and will proceed to pass through Sevilla Este and el Palacio de Congresos, Montesierra, Tesalónica (with a line 4 connection expected), Kansas City, the central station of Santa Justa, José Laguillo (a planned line 3 station), la Plaza del Duque, the Plaza de Armas bus station, before finally crossing the river to Torre Triana (a planned line 4 station). The line will not have a direct transfer with line 1.
This line is of vital importance in terms of the trajectory that it spans, especially since it passes beneath the historic centre of the city and connects the international bus station of Plaza de Armas with the central railroad station of Santa Justa. Consequently, it has been though necessary to advance the modernization of the existing metro and railway installations, thereby providing a direct connection between the international bus station and the high velocity train (AVE) station of Santa Justa. It is estimated that the depth of the central segment will be more than 50 metres.
Torre Triana | |||
Plaza de Armas | |||
Plaza del Duque | |||
Cristo de Burgos | |||
María Auxiliadora | |||
Santa Justa | |||
Kansas City | |||
San Pablo | |||
† | Carretera Amarilla | ||
Montesierra | |||
Luis Uruñuela | |||
Puerta Este | |||
Palacio de Congresos | |||
Ciencias | |||
Adelfas | |||
Aeronáutica | |||
Dr Miguel Rios | |||
* Line in planning phase. † Out-of-system transfer planned. |