Vijayawada-Hyderabad Expressway | |
---|---|
Route information | |
Maintained by National Highways Authority of India (NHAI) | |
Length | 247 km (153 mi) |
Existed | October 2012–present |
Major junctions | |
East end | Gollapudi, Vijayawada, Andhra Pradesh |
West end | Outer Ring Road, Hyderabad, Telangana |
Location | |
Country | India |
States | Andhra Pradesh and Telangana |
Districts | Krishna, Suryapet, Nalgonda, Yadadri Bhuvanagiri, Medchal–Malkajgiri, Ranga Reddy, Hyderabad |
Major cities | Suryapet |
Towns | Nandigama, Kodad, Nakrekal, Chityala, Choutuppal |
Villages | Paritala, Kanchikacherla, Narketpally |
Highway system | |
Vijayawada–Hyderabad Expressway is a 247 km long, 4/6 lane wide tolled expressway that connects Vijayawada in Andhra Pradesh with Hyderabad in Telangana. It was opened for public in October 2012.[1] The project was undertaken by concessionaire GMR Hyderabad Vijayawada Expressways Private Limited, a subsidiary of GMR Group on a Build-Own-Operate-Transfer (BOOT) basis.[2] It is one of the busiest expressways in India and is a part of National Highway 65, which connects Machilipatnam to Pune.[3]
In early 2007, National Highways Authority of India (NHAI) has decided to expand the existing two-lane into a four-lane of Vijayawada-Hyderabad section. The project has also been sanctioned in 2007. But, due to technical issues, the project was delayed. Then in 2009, bids were announced by the NHAI. Five bidders were finalized for the construction of the roadway.
GMR Group, one of the 5 bidders for the project got the bid at a concession period of 25 years and incorporated a subsidiary, GMR Hyderabad Vijayawada Expressways Private Limited on 11 June 2009 for this work.[4] The project was completed under this subsidiary.
The project was started on 22 March 2010 with an estimated cost ₹14.70 billion. The laying foundation ceremony was held at Narketpally attended by then Chief Minister of Andhra Pradesh, Konijeti Rosaiah, Jaipal Reddy and Ratanjit Pratap Narain Singh.[5] Earlier, three toll gates were set-up, whereas now, there are four. The project was completed in October 2012.[6]
After the Bifurcation of Andhra Pradesh, the expressway became a major roadway connecting Hyderabad, capital of Telangana and Vijayawada, capital of Andhra Pradesh. The expressway became a major hub for various businesses. Industrial parks, pharma sectors and other corridors were proposed by both Government of Telangana and Government of Andhra Pradesh.[7]