Enzyme Kinetics

From Handwiki
Short description: Study of biochemical reaction rates catalysed by an enzyme
Dihydrofolate reductase from E. coli with its two substrates dihydrofolate (right) and NADPH (left), bound in the active site. The protein is shown as a ribbon diagram, with alpha helices in red, beta sheathes in yellow and loops in blue. (PDB: 7DFR​)

Enzyme kinetics is the study of the rates of enzyme-catalysed chemical reactions. In enzyme kinetics, the reaction rate is measured and the effects of varying the conditions of the reaction are investigated. Studying an enzyme's kinetics in this way can reveal the catalytic mechanism of this enzyme, its role in metabolism, how its activity is controlled, and how a drug or a modifier (inhibitor or activator) might affect the rate.

An enzyme (E) is a protein molecule that serves as a biological catalyst to facilitate and accelerate a chemical reaction in the body. It does this through binding of another molecule, its substrate (S), which the enzyme acts upon to form the desired product. The substrate binds to the active site of the enzyme to produce an enzyme-substrate complex ES, and is transformed into an enzyme-product complex EP and from there to product P, via a transition state ES*. The series of steps is known as the mechanism:

E + S ⇄ ES ⇄ ES* ⇄ EP ⇄ E + P

This example assumes the simplest case of a reaction with one substrate and one product. Such cases exist: for example, a mutase such as phosphoglucomutase catalyses the transfer of a phosphate group from one position to another, and isomerase is a more general term for an enzyme that catalyses any one-substrate one-product reaction, such as triosephosphate isomerase. However, such enzymes are not very common, and are heavily outnumbered by enzymes that catalyse two-substrate two-product reactions: these include, for example, the NAD-dependent dehydrogenases such as alcohol dehydrogenase, which catalyses the oxidation of ethanol by NAD+. Reactions with three or four substrates or products are less common, but they exist. There is no necessity for the number of products to be equal to the number of substrates; for example, glyceraldehyde 3-phosphate dehydrogenase has three substrates and two products.

When enzymes bind multiple substrates, such as dihydrofolate reductase, enzyme kinetics can also show the sequence in which these substrates bind and the sequence in which products are released. An example of enzymes that bind a single substrate and release multiple products are proteases, which cleave one protein substrate into two polypeptide products. Others join two substrates together, such as DNA polymerase linking a nucleotide to DNA. Although these mechanisms are often a complex series of steps, there is typically one rate-determining step that determines the overall kinetics. This rate-determining step may be a chemical reaction or a conformational change of the enzyme or substrates, such as those involved in the release of product(s) from the enzyme.

Knowledge of the enzyme's structure is helpful in interpreting kinetic data. For example, the structure can suggest how substrates and products bind during catalysis; what changes occur during the reaction; and even the role of particular amino acid residues in the mechanism. Some enzymes change shape significantly during the mechanism; in such cases, it is helpful to determine the enzyme structure with and without bound substrate analogues that do not undergo the enzymatic reaction.

Not all biological catalysts are protein enzymes: RNA-based catalysts such as ribozymes and ribosomes are essential to many cellular functions, such as RNA splicing and translation. The main difference between ribozymes and enzymes is that RNA catalysts are composed of nucleotides, whereas enzymes are composed of amino acids. Ribozymes also perform a more limited set of reactions, although their reaction mechanisms and kinetics can be analysed and classified by the same methods.

General principles

As larger amounts of substrate are added to a reaction, the available enzyme binding sites become filled to the limit of Vmax. Beyond this limit the enzyme is saturated with substrate and the reaction rate ceases to increase.

The reaction catalysed by an enzyme uses exactly the same reactants and produces exactly the same products as the uncatalysed reaction. Like other catalysts, enzymes do not alter the position of equilibrium between substrates and products.[1] However, unlike uncatalysed chemical reactions, enzyme-catalysed reactions display saturation kinetics. For a given enzyme concentration and for relatively low substrate concentrations, the reaction rate increases linearly with substrate concentration; the enzyme molecules are largely free to catalyse the reaction, and increasing substrate concentration means an increasing rate at which the enzyme and substrate molecules encounter one another. However, at relatively high substrate concentrations, the reaction rate asymptotically approaches the theoretical maximum; the enzyme active sites are almost all occupied by substrates resulting in saturation, and the reaction rate is determined by the intrinsic turnover rate of the enzyme.[2] The substrate concentration midway between these two limiting cases is denoted by KM. Thus, KM is the substrate concentration at which the reaction velocity is half of the maximum velocity.[2]

The two important properties of enzyme kinetics are how easily the enzyme can be saturated with a substrate, and the maximum rate it can achieve. Knowing these properties suggests what an enzyme might do in the cell and can show how the enzyme will respond to changes in these conditions.[3]

Enzyme assays

Progress curve for an enzyme reaction. The slope in the initial rate period is the initial rate of reaction v. The Michaelis–Menten equation describes how this slope varies with the concentration of substrate.

Enzyme assays are laboratory procedures that measure the rate of enzyme reactions. Since enzymes are not consumed by the reactions they catalyse, enzyme assays usually follow changes in the concentration of either substrates or products to measure the rate of reaction. There are many methods of measurement. Spectrophotometric assays observe the change in the absorbance of light between products and reactants; radiometric assays involve the incorporation or release of radioactivity to measure the amount of product made over time. Spectrophotometric assays are most convenient since they allow the rate of the reaction to be measured continuously. Although radiometric assays require the removal and counting of samples (i.e., they are discontinuous assays) they are usually extremely sensitive and can measure very low levels of enzyme activity.[4] An analogous approach is to use mass spectrometry to monitor the incorporation or release of stable isotopes as the substrate is converted into product. Occasionally, an assay fails and approaches are essential to resurrect a failed assay.[5]

The most sensitive enzyme assays use lasers focused through a microscope to observe changes in single enzyme molecules as they catalyse their reactions. These measurements either use changes in the fluorescence of cofactors during an enzyme's reaction mechanism, or of fluorescent dyes added onto specific sites of the protein to report movements that occur during catalysis.[6] These studies provide a new view of the kinetics and dynamics of single enzymes, as opposed to traditional enzyme kinetics, which observes the average behaviour of populations of millions of enzyme molecules.[7][8]

An example progress curve for an enzyme assay is shown above. The enzyme produces product at an initial rate that is approximately linear for a short period after the start of the reaction. As the reaction proceeds and substrate is consumed, the rate continuously slows (so long as the substrate is not still at saturating levels). To measure the initial (and maximal) rate, enzyme assays are typically carried out while the reaction has progressed only a few percent towards total completion. The length of the initial rate period depends on the assay conditions and can range from milliseconds to hours. However, equipment for rapidly mixing liquids allows fast kinetic measurements at initial rates of less than one second.[9] These very rapid assays are essential for measuring pre-steady-state kinetics.[10]

Most enzyme kinetics studies concentrate on this initial, approximately linear part of enzyme reactions. However, it is also possible to measure the complete reaction curve and fit this data to a non-linear rate equation. This way of measuring enzyme reactions is called progress-curve analysis. This approach is useful as an alternative to rapid kinetics when the initial rate is too fast to measure accurately.[11]

The Standards for Reporting Enzymology Data Guidelines provide minimum information required to comprehensively report kinetic and equilibrium data from investigations of enzyme activities including corresponding experimental conditions. The guidelines have been developed to report functional enzyme data with rigor and robustness.[12]

Single-substrate reactions

Enzymes with single-substrate mechanisms include isomerases such as triosephosphateisomerase or bisphosphoglycerate mutase, intramolecular lyases such as adenylate cyclase and the hammerhead ribozyme, an RNA lyase.[13] However, some enzymes that only have a single substrate do not fall into this category of mechanisms. Catalase is an example of this, as the enzyme reacts with a first molecule of hydrogen peroxide substrate, becomes oxidised and is then reduced by a second molecule of substrate. Although a single substrate is involved, the existence of a modified enzyme intermediate means that the mechanism of catalase is actually a ping–pong mechanism,[14] a type of mechanism that is discussed in the Multi-substrate reactions section below.

Michaelis–Menten kinetics

Schematic reaction diagrams for uncatalzyed (Substrate to Product) and catalyzed (Enzyme + Substrate to Enzyme/Substrate complex to Enzyme + Product)
A chemical reaction mechanism with or without enzyme catalysis. The enzyme (E) binds substrate (S) to produce product (P).
A two dimensional plot of substrate concentration (x axis) vs. reaction rate (y axis). The shape of the curve is hyperbolic. The rate of the reaction is zero at zero concentration of substrate and the rate asymptotically reaches a maximum at high substrate concentration.
Saturation curve for an enzyme reaction showing the relation between the substrate concentration and reaction rate.

As enzyme-catalysed reactions are saturable, their rate of catalysis does not show a linear response to increasing substrate. If the initial rate of the reaction is measured over a range of substrate concentrations (denoted as [S]), the initial reaction rate (v0) increases as [S] increases. However, as [S] gets higher, the enzyme becomes saturated with substrate and the initial rate reaches Vmax, the enzyme's maximum rate.[15]

In the Michaelis–Menten kinetic model of a single-substrate reaction there is an initial bimolecular reaction between the enzyme E and substrate S to form the enzyme–substrate complex ES. The rate of enzymatic reaction increases with the increase of the substrate concentration up to a certain level called Vmax; at Vmax, increase in substrate concentration does not cause any increase in reaction rate as there is no more enzyme (E) available for reacting with substrate (S). Here, the rate of reaction becomes dependent on the ES complex and the reaction becomes a unimolecular reaction with an order of zero. Though the enzymatic mechanism for the unimolecular reaction ESkAcatE+P can be quite complex, there is typically one rate-determining enzymatic step that allows this reaction to be modelled as a single catalytic step with an apparent unimolecular rate constant kcat. If the reaction path proceeds over one or several intermediates, kcat will be a function of several elementary rate constants, whereas in the simplest case of a single elementary reaction (e.g. no intermediates) it will be identical to the elementary unimolecular rate constant k2. The apparent unimolecular rate constant kcat is also called turnover number, and denotes the maximum number of enzymatic reactions catalysed per second.[16]

The Michaelis–Menten equation[17] describes how the (initial) reaction rate v0 depends on the position of the substrate-binding equilibrium and the rate constant k2.[18]

v0=Vmax[S]KM+[S]    (Michaelis–Menten equation)

with the constants

KM =def k2+k1k1KDVmax =def kcat[E]tot

This Michaelis–Menten equation is the basis for most single-substrate enzyme kinetics. Two crucial assumptions underlie this equation (apart from the general assumption about the mechanism only involving no intermediate or product inhibition, and there is no allostericity or cooperativity). The first assumption is the so-called quasi-steady-state assumption (or pseudo-steady-state hypothesis), namely that the concentration of the substrate-bound enzyme (and hence also the unbound enzyme) changes much more slowly than those of the product and substrate and thus the change over time of the complex can be set to zero.[19]

d[ES]/dt=!0.

The second assumption is that the total enzyme concentration does not change over time, thus

[E]tot=[E]+[ES]=!const.

The Michaelis constant KM is experimentally defined as the concentration at which the rate of the enzyme reaction is half Vmax, which can be verified by substituting [S] = KM into the Michaelis–Menten equation and can also be seen graphically. If the rate-determining enzymatic step is slow compared to substrate dissociation (k2k1), the Michaelis constant KM is roughly the dissociation constant KD of the ES complex.[20] If [S] is small compared to KM then the term [S]/(KM+[S])[S]/KM and also very little ES complex is formed, thus [E]Atot[E]. Therefore, the rate of product formation is

v0kcatKM[E][S]if [S]KM

Thus the product formation rate depends on the enzyme concentration as well as on the substrate concentration, the equation resembles a bimolecular reaction with a corresponding pseudo-second order rate constant k2/KM. This constant is a measure of catalytic efficiency. The most efficient enzymes reach a k2/KM in the range of 108 – 1010 M−1 s−1. These enzymes are so efficient they effectively catalyse a reaction each time they encounter a substrate molecule and have thus reached an upper theoretical limit for efficiency (diffusion limit); and are sometimes referred to as kinetically perfect enzymes.[21] But most enzymes are far from perfect: the average values of k2/KM and k2 are about 105s1M1 and 10s1, respectively.[22]

Direct use of the Michaelis–Menten equation for time course kinetic analysis

{{Further|Reaction Progr 

The observed velocities predicted by the Michaelis–Menten equation can be used to directly model the time course disappearance of substrate and the production of product through incorporation of the Michaelis–Menten equation into the equation for first order chemical kinetics. This can only be achieved however if one recognises the problem associated with the use of Euler's number in the description of first order chemical kinetics. i.e. ek is a split constant that introduces a systematic error into calculations and can be rewritten as a single constant which represents the remaining substrate after each time period.[23]

[S]=[S]0(1k)t
[S]=[S]0(1v/[S]0)t
[S]=[S]0(1(Vmax[S]0/(KM+[S]0)/[S]0))t

In 1983 Stuart Beal (and also independently Santiago Schnell and Claudio Mendoza in 1997) derived a closed form solution for the time course kinetics analysis of the Michaelis-Menten mechanism.[24][25] The solution, known as the Schnell-Mendoza equation,[26] has the form:

[S]KM=W[F(t)]

where W[ ] is the Lambert-W function.[27][28] and where F(t) is

F(t)=[S]0KMexp([S]0KMVmaxKMt)

This equation is encompassed by the equation below, obtained by Berberan-Santos,[29] which is also valid when the initial substrate concentration is close to that of enzyme,

[S]KM=W[F(t)]VmaxkcatKM W[F(t)]1+W[F(t)]

where W[ ] is again the Lambert-W function.

Linear plots of the Michaelis–Menten equation

Lineweaver–Burk or double-reciprocal plot of kinetic data, showing the significance of the axis intercepts and gradient.

The plot of v versus [S] above is not linear; although initially linear at low [S], it bends over to saturate at high [S]. Before the modern era of nonlinear curve-fitting on computers, this nonlinearity could make it difficult to estimate KM and Vmax accurately. Therefore, several researchers developed linearisations of the Michaelis–Menten equation, such as the Lineweaver–Burk plot, the Eadie–Hofstee diagram and the Hanes–Woolf plot. All of these linear representations can be useful for visualising data, but none should be used to determine kinetic parameters, as computer software is readily available that allows for more accurate determination by nonlinear regression methods.[30]

The Lineweaver–Burk plot or double reciprocal plot is a common way of illustrating kinetic data. This is produced by taking the reciprocal of both sides of the Michaelis–Menten equation.[31] This is a linear form of the Michaelis–Menten equation and produces a straight line with the equation y = mx + c with a y-intercept equivalent to 1/Vmax and an x-intercept of the graph representing −1/KM.

1v=KMVmax[S]+1Vmax

No experimental values can be taken at negative 1/[S]; the lower limiting value 1/[S] = 0 (the y-intercept) corresponds to an infinite substrate concentration, where 1/v=1/Vmax thus, the x-intercept is an extrapolation of the experimental data taken at positive concentrations. More generally, the Lineweaver–Burk plot skews the importance of measurements taken at low substrate concentrations and, thus, can yield inaccurate estimates of Vmax and KM.[32] A more accurate linear plotting method is the Eadie–Hofstee plot. In this case, v is plotted against v/[S]. In the third common linear representation, the Hanes–Woolf plot, [S]/v is plotted against [S]. In general, data normalisation can help diminish the amount of experimental work and can increase the reliability of the output, and is suitable for both graphical and numerical analysis.[33]

Practical significance of kinetic constants

The study of enzyme kinetics is important for two basic reasons. Firstly, it helps explain how enzymes work, and secondly, it helps predict how enzymes behave in living organisms. The kinetic constants defined above, KM and Vmax, are critical to attempts to understand how enzymes work together to control metabolism.[34] Making these predictions is not trivial, even for simple systems. For example, oxaloacetate is formed by malate dehydrogenase within the mitochondrion. Oxaloacetate can then be consumed by citrate synthase, phosphoenolpyruvate carboxykinase or aspartate aminotransferase, feeding into the citric acid cycle, gluconeogenesis or aspartic acid biosynthesis, respectively. Being able to predict how much oxaloacetate goes into which pathway requires knowledge of the concentration of oxaloacetate as well as the concentration and kinetics of each of these enzymes. This aim of predicting the behaviour of metabolic pathways reaches its most complex expression in the synthesis of huge amounts of kinetic and gene expression data into mathematical models of entire organisms. Alternatively, one useful simplification of the metabolic modelling problem is to ignore the underlying enzyme kinetics and only rely on information about the reaction network's stoichiometry, a technique called flux balance analysis.[35][36]

Michaelis–Menten kinetics with intermediate

One could also consider the less simple case

E+SkA1kA1ESkA2EIkA3E+P

where a complex with the enzyme and an intermediate exists and the intermediate is converted into product in a second step. In this case we have a very similar equation[37]

v0=kcat[S][E]A0KM+[S]

but the constants are different

KM =def k3k2+k3KM=k3k2+k3k2+k1k1kcat =def k3k2k2+k3

We see that for the limiting case k3k2, thus when the last step from EIE+P is much faster than the previous step, we get again the original equation. Mathematically we have then KMKM and kcatk2.[38]

Multi-substrate reactions

Multi-substrate reactions follow complex rate equations that describe how the substrates bind and in what sequence. The analysis of these reactions is much simpler if the concentration of substrate A is kept constant and substrate B varied. Under these conditions, the enzyme behaves just like a single-substrate enzyme and a plot of v by [S] gives apparent KM and Vmax constants for substrate B. If a set of these measurements is performed at different fixed concentrations of A, these data can be used to work out what the mechanism of the reaction is. For an enzyme that takes two substrates A and B and turns them into two products P and Q, there are two types of mechanism: ternary complex and substituted-enzyme mechanisms.[39]

Ternary-complex mechanisms [40]

Random-order ternary-complex mechanism for an enzyme reaction. The reaction path is shown as a line and enzyme intermediates containing substrates A and B or products P and Q are written below the line.

In these enzymes, both substrates bind to the enzyme at the same time to produce an EAB ternary complex. The order of binding can either be random (in a random mechanism) or substrates have to bind in a particular sequence (in an ordered mechanism). When a set of v by [S] curves (fixed A, varying B) from an enzyme with a ternary-complex mechanism are plotted in a Lineweaver–Burk plot, the set of lines produced will intersect.[41]

Enzymes with ternary-complex mechanisms include glutathione S-transferase,[42] dihydrofolate reductase[43] and DNA polymerase.[44]

Substituted-enzyme ("ping–pong") mechanisms [45]

EAEAEAPPEABEABEQQE
Ping–pong mechanism for an enzyme reaction. Intermediates contain substrates A and B or products P and Q.

Enzymes with a substituted-enzyme mechanism can exist in two states, E and a chemically modified form of the enzyme E*; this modified enzyme is known as an intermediate. In such mechanisms, substrate A binds, changes the enzyme to E* by, for example, transferring a chemical group to the active site, and is then released. Only after the first substrate is released can substrate B bind and react with the modified enzyme, regenerating the unmodified E form. When a set of v by [S] curves (fixed A, varying B) from an enzyme with a substituted-enzyme mechanism are plotted in a Lineweaver–Burk plot, a set of parallel lines will be produced. This is called a secondary plot.[46][47]

Enzymes with substituted-enzyme mechanisms include some oxidoreductases such as thioredoxin peroxidase,[48] transferases such as acylneuraminate cytidylyltransferase[49] and serine proteases such as trypsin and chymotrypsin.[50] Serine proteases are a very common and diverse family of enzymes, including digestive enzymes (trypsin, chymotrypsin, and elastase), several enzymes of the blood clotting cascade and many others. In these serine proteases, the E* intermediate is an acyl-enzyme species formed by the attack of an active site serine residue on a peptide bond in a protein substrate.[51]

Memory effects

Both of these two types of mechanism can display enzyme memory, with very different causes and consequences in the two cases. In ternary complex mechanisms these are possible if the mechanism includes slow processes and the binding steps are not at quasi-equilibrium, because the intermediates may be swept away very fast. This can generate cooperativity, even in monomeric enzymes.[52] In a substituted-enzyme mechanism slow steps are not needed to generate memory effects. Instead, for an enzyme with several alternative substrates the kinetic properties of the second half reaction may vary with different substrates in the first half reaction, even though the same substituted enzyme seems to be transformed.[53]

Reversible catalysis and the Haldane equation[54] External factors may limit the ability of an enzyme to catalyse a reaction in both directions (whereas the nature of a catalyst in itself means that it cannot catalyse just one direction, according to the principle of microscopic reversibility).[55] We consider the case of an enzyme that catalyses the reaction in both directions:

E+SkA1kA1ESkA2kA2E+P

The steady-state, initial rate of the reaction is v0=d[P]dt=(k1k2[S]k1k2[P])[E]0k1+k2+k1[S]+k2[P]

v0 is positive if the reaction proceed in the forward direction (SP) and negative otherwise.

Equilibrium requires that v=0, which occurs when [P]eq[S]eq=k1k2k1k2=Keq. This shows that thermodynamics forces a relation between the values of the 4 rate constants.

The values of the forward and backward maximal rates, obtained for [S], [P]=0, and [S]=0, [P], respectively, are Vmaxf=k2[E]tot and Vmaxb=k1[E]tot, respectively. Their ratio is not equal to the equilibrium constant, which implies that thermodynamics does not constrain the ratio of the maximal rates. This explains that enzymes can be much "better catalysts" (in terms of maximal rates) in one particular direction of the reaction.[56]

On can also derive the two Michaelis constants KMS=(k1+k2)/k1and KMP=(k1+k2)/k2. The Haldane equation is the relation Keq=[P]eq[S]eq=Vmaxf/KMSVmaxb/KMP.

Therefore, thermodynamics constrains the ratio between the forward and backward Vmax/KM values, not the ratio of Vmaxvalues.

Non-Michaelis–Menten kinetics

Saturation curve for an enzyme reaction showing sigmoid kinetics.

Many different enzyme systems follow non Michaelis-Menten behavior. A select few examples include kinetics of self-catalytic enzymes, cooperative and allosteric enzymes, interfacial and intracellular enzymes, processive enzymes and so forth. Some enzymes produce a sigmoid v by [S] plot, which often indicates cooperative binding of substrate to the active site. This means that the binding of one substrate molecule affects the binding of subsequent substrate molecules. This behavior is most common in multimeric enzymes with several interacting active sites.[57] Here, the mechanism of cooperation is similar to that of hemoglobin, with binding of substrate to one active site altering the affinity of the other active sites for substrate molecules. Positive cooperativity occurs when binding of the first substrate molecule increases the affinity of the other active sites for substrate. Negative cooperativity occurs when binding of the first substrate decreases the affinity of the enzyme for other substrate molecules.[58] Allosteric enzymes include mammalian tyrosyl tRNA-synthetase, which shows negative cooperativity,[59] and bacterial aspartate transcarbamoylase[60] and phosphofructokinase which show positive cooperativity.[61] Cooperativity is common and can help regulate the responses of enzymes to changes in the concentrations of their substrates. Positive cooperativity makes enzymes much more sensitive to [S] and their activities can show large changes over a narrow range of substrate concentration. Conversely, negative cooperativity makes enzymes insensitive to small changes in [S].[62]

The Hill equation[63] is often used to describe the degree of cooperativity quantitatively in non-Michaelis–Menten kinetics. The derived Hill coefficient n measures how much the binding of substrate to one active site affects the binding of substrate to the other active sites. A Hill coefficient of <1 indicates negative cooperativity and a coefficient of >1 indicates positive cooperativity.[64]

Pre-steady-state kinetics

Pre-steady state progress curve, showing the burst phase of an enzyme reaction.

In the first moment after an enzyme is mixed with substrate, no product has been formed and no intermediates exist. The study of the next few milliseconds of the reaction is called pre-steady-state kinetics. Pre-steady-state kinetics is therefore concerned with the formation and consumption of enzyme–substrate intermediates (such as ES or E*) until their steady-state concentrations are reached.[65]

This approach was first applied to the hydrolysis reaction catalysed by chymotrypsin.[66] Often, the detection of an intermediate is a vital piece of evidence in investigations of what mechanism an enzyme follows. For example, in the ping–pong mechanisms that are shown above, rapid kinetic measurements can follow the release of product P and measure the formation of the modified enzyme intermediate E*.[67] In the case of chymotrypsin, this intermediate is formed by an attack on the substrate by the nucleophilic serine in the active site and the formation of the acyl-enzyme intermediate.[68]

In the figure, the enzyme produces E* rapidly in the first few seconds of the reaction. The rate then slows as steady state is reached. This rapid burst phase of the reaction measures a single turnover of the enzyme. Consequently, the amount of product released in this burst, shown as the intercept on the y-axis of the graph, also gives the amount of functional enzyme which is present in the assay.[69]

Chemical mechanism

An important goal of measuring enzyme kinetics is to determine the chemical mechanism of an enzyme reaction, i.e., the sequence of chemical steps that transform substrate into product. The kinetic approaches discussed above will show at what rates intermediates are formed and inter-converted, but they cannot identify exactly what these intermediates are.[70]

Kinetic measurements taken under various solution conditions or on slightly modified enzymes or substrates often shed light on this chemical mechanism, as they reveal the rate-determining step or intermediates in the reaction. For example, the breaking of a covalent bond to a hydrogen atom is a common rate-determining step. Which of the possible hydrogen transfers is rate determining can be shown by measuring the kinetic effects of substituting each hydrogen by deuterium, its stable isotope. The rate will change when the critical hydrogen is replaced, due to a primary kinetic isotope effect, which occurs because bonds to deuterium are harder to break than bonds to hydrogen.[71] It is also possible to measure similar effects with other isotope substitutions, such as 13C/12C and 18O/16O, but these effects are more subtle.[72]

Isotopes can also be used to reveal the fate of various parts of the substrate molecules in the final products. For example, it is sometimes difficult to discern the origin of an oxygen atom in the final product; since it may have come from water or from part of the substrate. This may be determined by systematically substituting oxygen's stable isotope 18O into the various molecules that participate in the reaction and checking for the isotope in the product.[73] The chemical mechanism can also be elucidated by examining the kinetics and isotope effects under different pH conditions,[74] by altering the metal ions or other bound cofactors,[75] by site-directed mutagenesis of conserved amino acid residues, or by studying the behaviour of the enzyme in the presence of analogues of the substrate(s).[76]

Enzyme inhibition and activation

Kinetic scheme for reversible enzyme inhibitors.

Enzyme inhibitors are molecules that reduce or abolish enzyme activity, while enzyme activators are molecules that increase the catalytic rate of enzymes. These interactions can be either reversible (i.e., removal of the inhibitor restores enzyme activity) or irreversible (i.e., the inhibitor permanently inactivates the enzyme).[77]

Reversible inhibitors

Traditionally reversible enzyme inhibitors have been classified as competitive, uncompetitive, or non-competitive, according to their effects on KM and Vmax. These different effects result from the inhibitor binding to the enzyme E, to the enzyme–substrate complex ES, or to both, respectively. The division of these classes arises from a problem in their derivation and results in the need to use two different binding constants for one binding event. The binding of an inhibitor and its effect on the enzymatic activity are two distinctly different things, another problem the traditional equations fail to acknowledge. In noncompetitive inhibition the binding of the inhibitor results in 100% inhibition of the enzyme only, and fails to consider the possibility of anything in between.[78] In noncompetitive inhibition, the inhibitor will bind to an enzyme at its allosteric site; therefore, the binding affinity, or inverse of KM, of the substrate with the enzyme will remain the same. On the other hand, the Vmax will decrease relative to an uninhibited enzyme. On a Lineweaver-Burk plot, the presence of a noncompetitive inhibitor is illustrated by a change in the y-intercept, defined as 1/Vmax. The x-intercept, defined as −1/KM, will remain the same. In competitive inhibition, the inhibitor will bind to an enzyme at the active site, competing with the substrate. As a result, the KM will increase and the Vmax will remain the same.[79] The common form of the inhibitory term also obscures the relationship between the inhibitor binding to the enzyme and its relationship to any other binding term be it the Michaelis–Menten equation or a dose response curve associated with ligand receptor binding.[80] To demonstrate the relationship the following rearrangement can be made:

Vmax1+[I]Ki=Vmax[I]+KiKi

Adding zero to the bottom ([I]-[I])

Vmax[I]+Ki[I]+Ki[I]

Dividing by [I]+Ki

Vmax11[I][I]+Ki=VmaxVmax[I][I]+Ki

This notation demonstrates that similar to the Michaelis–Menten equation, where the rate of reaction depends on the percent of the enzyme population interacting with substrate, the effect of the inhibitor is a result of the percent of the enzyme population interacting with inhibitor. The only problem with this equation in its present form is that it assumes absolute inhibition of the enzyme with inhibitor binding, when in fact there can be a wide range of effects anywhere from 100% inhibition of substrate turn over to just >0%.[81] To account for this the equation can be easily modified to allow for different degrees of inhibition by including a delta Vmax term.

VmaxΔVmax[I][I]+Ki

or

Vmax1(Vmax1Vmax2)[I][I]+Ki

This term can then define the residual enzymatic activity present when the inhibitor is interacting with individual enzymes in the population. However the inclusion of this term has the added value of allowing for the possibility of activation if the secondary Vmax term turns out to be higher than the initial term. To account for the possibly of activation as well the notation can then be rewritten replacing the inhibitor "I" with a modifier term denoted here as "X".

Vmax1(Vmax1Vmax2)[X][X]+Kx

While this terminology results in a simplified way of dealing with kinetic effects relating to the maximum velocity of the Michaelis–Menten equation, it highlights potential problems with the term used to describe effects relating to the KM. The KM relating to the affinity of the enzyme for the substrate should in most cases relate to potential changes in the binding site of the enzyme which would directly result from enzyme inhibitor interactions. As such a term similar to the one proposed above to modulate Vmax should be appropriate in most situations:[82]

Km1(Km1Km2)[X][X]+Kx

Irreversible inhibitors

Enzyme inhibitors can also irreversibly inactivate enzymes, usually by covalently modifying active site residues. These reactions, which may be called suicide substrates, follow exponential decay functions and are usually saturable. Below saturation, they follow first order kinetics with respect to inhibitor. Irreversible inhibition could be classified into two distinct types. Affinity labelling is a type of irreversible inhibition where a functional group that is highly reactive modifies a catalytically critical residue on the protein of interest to bring about inhibition. Mechanism-based inhibition, on the other hand, involves binding of the inhibitor followed by enzyme mediated alterations that transform the latter into a reactive group that irreversibly modifies the enzyme.[83]

Mechanisms of catalysis

The energy variation as a function of reaction coordinate shows the stabilisation of the transition state by an enzyme.

The favoured model for the enzyme–substrate interaction is the induced fit model.[84] This model proposes that the initial interaction between enzyme and substrate is relatively weak, but that these weak interactions rapidly induce conformational changes in the enzyme that strengthen binding. These conformational changes also bring catalytic residues in the active site close to the chemical bonds in the substrate that will be altered in the reaction.[85] Conformational changes can be measured using circular dichroism or dual polarisation interferometry. After binding takes place, one or more mechanisms of catalysis lower the energy of the reaction's transition state by providing an alternative chemical pathway for the reaction. Mechanisms of catalysis include catalysis by bond strain; by proximity and orientation; by active-site proton donors or acceptors; covalent catalysis and quantum tunnelling.[67][86] Enzymes can accelerate hydrogen transfer reactions by quantum tunneling, a phenomenon where particles such protons or electrons pass through an energy barrier rather than over it, due to their wave-like nature.[87]

Enzyme kinetics cannot prove which modes of catalysis are used by an enzyme. However, some kinetic data can suggest possibilities to be examined by other techniques. For example, a ping–pong mechanism with burst-phase pre-steady-state kinetics would suggest covalent catalysis might be important in this enzyme's mechanism. Alternatively, the observation of a strong pH effect on Vmax but not KM might indicate that a residue in the active site needs to be in a particular ionisation state for catalysis to occur.[88]

History

In 1902 Victor Henri proposed a quantitative theory of enzyme kinetics,[89] but at the time the experimental significance of the hydrogen ion concentration was not yet recognized. After Peter Lauritz Sørensen had defined the logarithmic pH-scale and introduced the concept of buffering in 1909[90] the German chemist Leonor Michaelis and Dr. Maud Leonora Menten (a postdoctoral researcher in Michaelis's lab at the time) repeated Henri's experiments and confirmed his equation, which is now generally referred to as Michaelis-Menten kinetics (sometimes also Henri-Michaelis-Menten kinetics).[91] Their work was further developed by G. E. Briggs and J. B. S. Haldane, who derived kinetic equations that are still widely considered today a starting point in modeling enzymatic activity.[92]

The major contribution of the Henri-Michaelis-Menten approach was to think of enzyme reactions in two stages.[93] In the first, the substrate binds reversibly to the enzyme, forming the enzyme-substrate complex. This is sometimes called the Michaelis complex. The enzyme then catalyzes the chemical step in the reaction and releases the product. The kinetics of many enzymes is adequately described by the simple Michaelis-Menten model, but all enzymes have internal motions that are not accounted for in the model and can have significant contributions to the overall reaction kinetics. This can be modeled by introducing several Michaelis-Menten pathways that are connected with fluctuating rates,[94][95][96] which is a mathematical extension of the basic Michaelis Menten mechanism.[97]

Software

ENZO (Enzyme Kinetics) is a graphical interface tool for building kinetic models of enzyme catalyzed reactions. ENZO automatically generates the corresponding differential equations from a stipulated enzyme reaction scheme. These differential equations are processed by a numerical solver and a regression algorithm which fits the coefficients of differential equations to experimentally observed time course curves. ENZO allows rapid evaluation of rival reaction schemes and can be used for routine tests in enzyme kinetics.[98]

See also

References

  1. General chemistry (4th ed.). Boston: Houghton Mifflin. 1993. ISBN 978-0-395-63696-1. 
  2. 2.0 2.1 Fromm H.J., Hargrove M.S. (2012) Enzyme Kinetics. In: Essentials of Biochemistry. Springer, Berlin, Heidelberg
  3. Ochs 2014, p. 90
  4. Enzyme assays: a practical approach. Oxford [Oxfordshire]: Oxford University Press. 2002. ISBN 978-0-19-963820-8. 
  5. "Monitoring enzyme catalysis with mass spectrometry". The Journal of Biological Chemistry 275 (18): 13455–9. May 2000. doi:10.1074/jbc.275.18.13455. PMID 10788458. 
  6. "Single-molecule enzymology". The Journal of Biological Chemistry 274 (23): 15967–15970. June 1999. doi:10.1074/jbc.274.23.15967. PMID 10347141. 
  7. "Single-molecule spectroscopy studies of conformational change dynamics in enzymatic reactions". Current Pharmaceutical Biotechnology 5 (3): 261–269. June 2004. doi:10.2174/1389201043376887. PMID 15180547. 
  8. "Structure, dynamics, and catalytic function of dihydrofolate reductase". Annual Review of Biophysics and Biomolecular Structure 33: 119–140. 2004. doi:10.1146/annurev.biophys.33.110502.133613. PMID 15139807. 
  9. Gibson QH (1969). "[6] Rapid mixing: Stopped flow". Rapid mixing: Stopped flow. Methods in Enzymology. 16. pp. 187–228. doi:10.1016/S0076-6879(69)16009-7. ISBN 978-0-12-181873-9. 
  10. "Full Pre-Steady-State Kinetic Analysis of Single Nucleotide Incorporation by DNA Polymerases". Current Protocols in Nucleic Acid Chemistry 78 (1). September 2019. doi:10.1002/cpnc.98. PMID 31529783. 
  11. Duggleby RG (1995). "[3] Analysis of enzyme progress curves by nonlinear regression". Analysis of enzyme progress curves by non-linear regression. Methods in Enzymology. 249. pp. 61–90. doi:10.1016/0076-6879(95)49031-0. ISBN 978-0-12-182150-0. 
  12. "Enzyme Inhibitors from Gorgonians and Soft Corals". Marine Drugs 21 (2): 104. January 2023. doi:10.3390/md21020104. PMID 36827145. 
  13. "A pH-dependent conformational change, rather than the chemical step, appears to be rate-limiting in the hammerhead ribozyme cleavage reaction". Journal of Molecular Biology 315 (2): 121–130. January 2002. doi:10.1006/jmbi.2001.5145. PMID 11779233. https://escholarship.org/uc/item/28h464wj. 
  14. "Catalase: Physical and chemical properties, mechanism of catalysis, and physiological role". Physiological Reviews 50 (3): 319–75. July 1970. doi:10.1152/physrev.1970.50.3.319. PMID 4912904. 
  15. Ochs 2014, pp. 88–90
  16. "Considerations when Measuring Biocatalyst Performance". Molecules (Basel, Switzerland) 24 (19): 3573. October 2019. doi:10.3390/molecules24193573. PMID 31623317. 
  17. Michaelis L. and Menten M.L. Kinetik der Invertinwirkung Biochem. Z. 1913; 49:333–369 English translation Accessed 6 April 2007
  18. Ochs 2014, p. 88
  19. "A Note on the Kinetics of Enzyme Action". The Biochemical Journal 19 (2): 338–9. 1925. doi:10.1042/bj0190338. PMID 16743508. 
  20. Seibert, E., Tracy, T.S. (2021). Fundamentals of Enzyme Kinetics: Michaelis-Menten and Non-Michaelis–Type (Atypical) Enzyme Kinetics. In: Nagar, S., Argikar, U.A., Tweedie, D. (eds) Enzyme Kinetics in Drug Metabolism. Methods in Molecular Biology, vol 2342. Humana, New York, NY. https://doi.org/10.1007/978-1-0716-1554-6_1
  21. "Superefficient enzymes". Cellular and Molecular Life Sciences 58 (10): 1451–1460. September 2001. doi:10.1007/PL00000788. PMID 11693526. 
  22. "The moderately efficient enzyme: evolutionary and physicochemical trends shaping enzyme parameters". Biochemistry 50 (21): 4402–4410. May 2011. doi:10.1021/bi2002289. PMID 21506553. 
  23. "A method to describe enzyme-catalyzed reactions by combining steady state and time course enzyme kinetic parameters". Biochimica et Biophysica Acta (BBA) - General Subjects 1800 (1): 1–5. January 2010. doi:10.1016/j.bbagen.2009.10.007. PMID 19840832. 
  24. "Computation of the explicit solution to the Michaelis-Menten equation". Journal of Pharmacokinetics and Biopharmaceutics 11 (6): 641–657. December 1983. doi:10.1007/BF01059062. PMID 6689584. 
  25. "Closed Form Solution for Time-dependent Enzyme Kinetics". Journal of Theoretical Biology 187 (2): 207–212. 1997. doi:10.1006/jtbi.1997.0425. Bibcode1997JThBi.187..207S. 
  26. "The Michaelis-Menten Reaction at Low Substrate Concentrations: Pseudo-First-Order Kinetics and Conditions for Timescale Separation". Bulletin of Mathematical Biology 86 (6): 68. May 2024. doi:10.1007/s11538-024-01295-z. PMID 38703247. 
  27. "Parameter estimation using a direct solution of the integrated Michaelis-Menten equation". Biochimica et Biophysica Acta (BBA) - Protein Structure and Molecular Enzymology 1429 (2): 377–383. January 1999. doi:10.1016/s0167-4838(98)00247-7. PMID 9989222. http://rdbiotech.drivehq.com/Biblio/Pubs/Pub103.pdf. 
  28. "Progress curve analysis for enzyme and microbial kinetic reactions using explicit solutions based on the Lambert W function". Journal of Microbiological Methods 59 (3): 317–326. December 2004. doi:10.1016/j.mimet.2004.06.013. PMID 15488275. 
  29. "A General Treatment of Henri Michaelis Menten Enzyme Kinetics: Exact Series Solution and Approximate Analytical Solutions". MATCH Communications in Mathematical and in Computer Chemistry 63: 283. 2010. http://match.pmf.kg.ac.rs/electronic_versions/Match63/n2/match63n2_283-318.pdf. 
  30. "Analysis of algebraic weighted least-squares estimators for enzyme parameters". The Biochemical Journal 288 ( Pt 2) (Pt 2): 533–538. December 1992. doi:10.1042/bj2880533. PMID 1463456. 
  31. Lineweaver, Hans; Burk, Dean (March 1934). "The Determination of Enzyme Dissociation Constants" (in en). Journal of the American Chemical Society 56 (3): 658–666. doi:10.1021/ja01318a036. ISSN 0002-7863. Bibcode1934JAChS..56..658L. https://pubs.acs.org/doi/abs/10.1021/ja01318a036. 
  32. "A comparison of the parameter estimating procedures for the Michaelis-Menten model". Journal of Theoretical Biology 145 (4): 457–464. August 1990. doi:10.1016/S0022-5193(05)80481-3. PMID 2246896. Bibcode1990JThBi.145..457T. 
  33. "A normalized plot as a novel and time-saving tool in complex enzyme kinetic analysis". The Biochemical Journal 358 (Pt 3): 573–583. September 2001. doi:10.1042/bj3580573. PMID 11577687. 
  34. "Parameter Reliability and Understanding Enzyme Function". Molecules 27 (1): 263. January 2022. doi:10.3390/molecules27010263. PMID 35011495. 
  35. "Global organization of metabolic fluxes in the bacterium Escherichia coli". Nature 427 (6977): 839–843. February 2004. doi:10.1038/nature02289. PMID 14985762. Bibcode2004Natur.427..839A. 
  36. "An expanded genome-scale model of Escherichia coli K-12 (iJR904 GSM/GPR)". Genome Biology 4 (9). 2003. doi:10.1186/gb-2003-4-9-r54. PMID 12952533. 
  37. for a complete derivation, see here
  38. "Enzyme kinetics modeling as a tool to optimize food industry: a pragmatic approach based on amylolytic enzymes". Critical Reviews in Food Science and Nutrition 55 (12): 1758–70. 2015. doi:10.1080/10408398.2012.725112. PMID 24758273. 
  39. "Random-order ternary complex reaction mechanism of serine acetyltransferase from Escherichia coli". Biochemistry 42 (10): 3113–9. March 2003. doi:10.1021/bi0267893. PMID 12627979. 
  40. "Different Mechanisms of Catalytic Complex Formation in Two L-Tryptophan Processing Dioxygenases". Frontiers in Molecular Biosciences 4. 2017. doi:10.3389/fmolb.2017.00094. PMID 29354636. 
  41. "Mixed and non-competitive enzyme inhibition: underlying mechanisms and mechanistic irrelevance of the formal two-site model". Journal of Enzyme Inhibition and Medicinal Chemistry 38 (1). December 2023. doi:10.1080/14756366.2023.2245168. PMID 37577806. 
  42. "X-ray crystal structures of cytosolic glutathione S-transferases. Implications for protein architecture, substrate recognition and catalytic function". European Journal of Biochemistry 220 (3): 645–661. March 1994. doi:10.1111/j.1432-1033.1994.tb18666.x. PMID 8143720. 
  43. "Dihydrofolate reductase from Escherichia coli: the kinetic mechanism with NADPH and reduced acetylpyridine adenine dinucleotide phosphate as substrates". Biochemistry 27 (15): 5493–5499. July 1988. doi:10.1021/bi00415a016. PMID 3052577. 
  44. Fisher PA (1994). Enzymologic mechanism of replicative DNA polymerases in higher eukaryotes. Progress in Nucleic Acid Research and Molecular Biology. 47. pp. 371–97. doi:10.1016/S0079-6603(08)60257-3. ISBN 978-0-12-540047-3. https://archive.org/details/progressinnuclei0000unse/page/371. 
  45. "NAD(P)H quinone oxidoreductase (NQO1): an enzyme which needs just enough mobility, in just the right places". Bioscience Reports 39 (1). January 2019. doi:10.1042/BSR20180459. PMID 30518535. 
  46. A. Cornish-Bowden. Fundamentals of Enzyme kinetics Rev. ed., Portland: London, England, (1995) pp. 30-37, 56-57.
  47. J. N. Rodriguez-Lopez, M. A. Gilabert, J. Tudela, R. N. F. Thorneley, and F. Garcia-Canovas. Biochemistry, 2000, 39, 13201-13209.
  48. "2-Cys peroxiredoxin PfTrx-Px1 is involved in the antioxidant defence of Plasmodium falciparum". Molecular and Biochemical Parasitology 130 (2): 75–81. August 2003. doi:10.1016/S0166-6851(03)00161-0. PMID 12946843. 
  49. "Kinetic properties of the acylneuraminate cytidylyltransferase from Pasteurella haemolytica A2". The Biochemical Journal 358 (Pt 3): 585–598. September 2001. doi:10.1042/bj3580585. PMID 11577688. 
  50. "Serine proteases: structure and mechanism of catalysis". Annual Review of Biochemistry 46: 331–358. 1977. doi:10.1146/annurev.bi.46.070177.001555. PMID 332063. 
  51. Bin Liu, Christopher J. Schofield, Rupert C. Wilmouth, Structural Analyses on Intermediates in Serine Protease Catalysis*, Journal of Biological Chemistry, Volume 281, Issue 33, 2006, Pages 24024-24035, ISSN 0021-9258, https://doi.org/10.1074/jbc.M600495200.
  52. Cornish-Bowden, Athel; Cárdenas, María Luz (1987). "Co-operativity in monomeric enzymes". J. Theor. Biol. 124 (1): 1–23. doi:10.1016/s0022-5193(87)80248-5. PMID 3309473. Bibcode1987JThBi.124....1C. 
  53. Jarabak, Rebecca; Westley, John (1974). "Enzymic memory. Consequence of conformational mobility". Biochemistry 13 (16): 3237–3239. doi:10.1021/bi00713a007. PMID 4842741. 
  54. "A note on the kinetics of enzyme action: a decomposition that highlights thermodynamic effects". FEBS Letters 587 (17): 2772–7. September 2013. doi:10.1016/j.febslet.2013.07.028. PMID 23892083. Bibcode2013FEBSL.587.2772N. 
  55. "The Principle of Microscopic Reversibility". Proc Natl Acad Sci U S A 11 (7): 436–9. July 1925. doi:10.1073/pnas.11.7.436. PMID 16587035. Bibcode1925PNAS...11..436T. 
  56. Cornish-Bowden, Athel (2012). Fundamentals of Enzyme Kinetics. Wiley-Blackwell. "Some enzymes are much more effective catalysts for one direction than the other. As a striking example, the limiting rates of the forward reaction catalyzed by methionine adenosyltransferase is about 105 greater than that for the reverse direction, even though the equilibrium constant is close to unity (page 59)." 
  57. "Co-operative and allosteric enzymes: 20 years on". European Journal of Biochemistry 166 (2): 255–272. July 1987. doi:10.1111/j.1432-1033.1987.tb13510.x. PMID 3301336. 
  58. "Thresholds and ultrasensitivity from negative cooperativity". Science 352 (6288): 990–3. May 2016. doi:10.1126/science.aad5937. PMID 27174675. Bibcode2016Sci...352..990H. 
  59. "Tyrosyl-tRNA synthetase acts as an asymmetric dimer in charging tRNA. A rationale for half-of-the-sites activity". Biochemistry 27 (15): 5525–5530. July 1988. doi:10.1021/bi00415a021. PMID 3179266. 
  60. "Allosteric regulation of catalytic activity: Escherichia coli aspartate transcarbamoylase versus yeast chorismate mutase". Microbiology and Molecular Biology Reviews 65 (3): 404–21, table of contents. September 2001. doi:10.1128/MMBR.65.3.404-421.2001. PMID 11528003. 
  61. "Structural basis of the allosteric behaviour of phosphofructokinase". Nature 343 (6254): 140–145. January 1990. doi:10.1038/343140a0. PMID 2136935. Bibcode1990Natur.343..140S. 
  62. "A half-site multimeric enzyme achieves its cooperativity without conformational changes". Sci Rep 7 (1). November 2017. doi:10.1038/s41598-017-16421-2. PMID 29184087. Bibcode2017NatSR...716529V. 
  63. "The possible effects of the aggregation of the molecules of haemoglobin on its dissociation curves.". J. Physiol. 40: iv–vii. 1910. 
  64. "Hill coefficients, dose-response curves and allosteric mechanisms". J Chem Biol 3 (1): 37–44. March 2010. doi:10.1007/s12154-009-0029-3. PMID 19779939. 
  65. "Steady-state, pre-steady-state, and single-turnover kinetic measurement for DNA glycosylase activity". Journal of Visualized Experiments (78). August 2013. doi:10.3791/50695. PMID 23995844. 
  66. "The reaction of p-nitrophenyl esters with chymotrypsin and insulin". The Biochemical Journal 56 (2): 288–297. February 1954. doi:10.1042/bj0560288. PMID 13140189. 
  67. 67.0 67.1 Fersht, Alan (1999). Structure and mechanism in protein science: a guide to enzyme catalysis and protein folding. San Francisco: W.H. Freeman. ISBN 978-0-7167-3268-6. 
  68. "Details of the acyl-enzyme intermediate and the oxyanion hole in serine protease catalysis". Biochemistry 33 (2): 552–61. January 1994. doi:10.1021/bi00168a021. PMID 8286385. 
  69. "The determination of the concentration of hydrolytic enzyme solutions: alpha-chymotrypsin, trypsin, papain, elastase, subtilisin, and acetylcholinesterase". Journal of the American Chemical Society 88 (24): 5890–5913. December 1966. doi:10.1021/ja00976a034. PMID 5980876. Bibcode1966JAChS..88.5890B. 
  70. "Kinetic competence of enzymic intermediates: fact or fiction?". Biochemistry 29 (13): 3194–7. April 1990. doi:10.1021/bi00465a006. PMID 2334688. 
  71. "The use of isotope effects to determine enzyme mechanisms". Archives of Biochemistry and Biophysics 433 (1): 2–12. January 2005. doi:10.1016/j.abb.2004.08.027. PMID 15581561. 
  72. "The expression of isotope effects on enzyme-catalyzed reactions". Annual Review of Biochemistry 50: 103–131. 1981. doi:10.1146/annurev.bi.50.070181.000535. PMID 7023356. 
  73. "Drug biotransformation: mechanistic studies with stable isotopes". Journal of Clinical Pharmacology 26 (6): 448–451. 1986. doi:10.1002/j.1552-4604.1986.tb03556.x. PMID 3734135. 
  74. "Use of isotope effects to elucidate enzyme mechanisms". CRC Critical Reviews in Biochemistry 13 (4): 385–428. 1982. doi:10.3109/10409238209108715. PMID 6759038. 
  75. "Catalysis by metal-activated hydroxide in zinc and manganese metalloenzymes". Annual Review of Biochemistry 68: 33–57. 1999. doi:10.1146/annurev.biochem.68.1.33. PMID 10872443. 
  76. "Challenges in enzyme mechanism and energetics". Annual Review of Biochemistry 72: 517–571. 2003. doi:10.1146/annurev.biochem.72.121801.161617. PMID 12704087. 
  77. Ochs, Raymond S. (2012). Biochemistry. Burlington, Mass: Jones & Bartlett Publishers. p. 98. ISBN 978-1-4496-6137-3. 
  78. "Limitations of conventional inhibitor classifications". Integrative Biology 3 (12): 1197–1201. December 2011. doi:10.1039/c1ib00053e. PMID 22038120. 
  79. "The kinetics of enzyme-catalyzed reactions with two or more substrates or products. III. Prediction of initial velocity and inhibition patterns by inspection". Biochimica et Biophysica Acta 67: 188–196. February 1963. doi:10.1016/0006-3002(63)91816-x. PMID 14021669. 
  80. Strelow J, Dewe W, Iversen PW, et al. Mechanism of Action Assays for Enzymes. 2012 May 1 [Updated 2012 Oct 1]. In: Markossian S, Grossman A, Baskir H, et al., editors. Assay Guidance Manual [Internet]. Bethesda (MD): Eli Lilly & Company and the National Center for Advancing Translational Sciences; 2004. Available from: https://www.ncbi.nlm.nih.gov/books/NBK92001/
  81. Ryan Walsh, (2024), The Fundamental Problem With Enzyme Inhibition Theory. Qeios. doi:10.32388/EHYCT1.
  82. "A versatile equation to describe reversible enzyme inhibition and activation kinetics: modeling beta-galactosidase and butyrylcholinesterase". Biochimica et Biophysica Acta (BBA) - General Subjects 1770 (5): 733–746. May 2007. doi:10.1016/j.bbagen.2007.01.001. PMID 17307293. 
  83. "Cysteine-targeted Irreversible Inhibitors of Tyrosine Kinases and Key Interactions". Current Medicinal Chemistry 26 (31): 5811–5824. 2019. doi:10.2174/0929867325666180713124223. PMID 30009703. 
  84. "Application of a Theory of Enzyme Specificity to Protein Synthesis". Proceedings of the National Academy of Sciences of the United States of America 44 (2): 98–104. February 1958. doi:10.1073/pnas.44.2.98. PMID 16590179. Bibcode1958PNAS...44...98K. 
  85. "Multiple conformational changes in enzyme catalysis". Biochemistry 41 (26): 8221–8228. July 2002. doi:10.1021/bi0260839. PMID 12081470. 
  86. "A new conceptual framework for enzyme catalysis. Hydrogen tunnelling coupled to enzyme dynamics in flavoprotein and quinoprotein enzymes". European Journal of Biochemistry 269 (13): 3096–3102. July 2002. doi:10.1046/j.1432-1033.2002.03020.x. PMID 12084049. 
  87. "Combined Quantum Mechanics and Molecular Mechanics Studies of Enzymatic Reaction Mechanisms". Advances in Protein Chemistry and Structural Biology 113: 1–32. 2018. doi:10.1016/bs.apcsb.2018.07.001. ISBN 978-0-12-813916-5. PMID 30149903. 
  88. "Beyond enzyme kinetics: direct determination of mechanisms by stopped-flow mass spectrometry". Bioorganic & Medicinal Chemistry 5 (4): 641–4. April 1997. doi:10.1016/s0968-0896(97)00020-5. PMID 9158861. 
  89. "Theorie generale de l'action de quelques diastases". Compt. Rend. Acad. Sci. Paris 135: 916–9. 1902. 
  90. "Enzymstudien {II}. Über die Messung und Bedeutung der Wasserstoffionenkonzentration bei enzymatischen Prozessen" (in de). Biochem. Z. 21: 131–304. 1909. 
  91. "Die Kinetik der Invertinwirkung" (in de). Biochem. Z. 49: 333–369. 1913. ; "The original Michaelis constant: translation of the 1913 Michaelis-Menten paper". Biochemistry 50 (39): 8264–8269. October 2011. doi:10.1021/bi201284u. PMID 21888353. 
  92. "A Note on the Kinetics of Enzyme Action". The Biochemical Journal 19 (2): 338–339. 1925. doi:10.1042/bj0190338. PMID 16743508. 
  93. "The origins of enzyme kinetics". FEBS Letters 587 (17): 2725–30. September 2013. doi:10.1016/j.febslet.2013.06.009. PMID 23791665. Bibcode2013FEBSL.587.2725C. 
  94. "Stretched exponential decay and correlations in the catalytic activity of fluctuating single lipase molecules". Proceedings of the National Academy of Sciences of the United States of America 102 (7): 2368–2372. February 2005. doi:10.1073/pnas.0409039102. PMID 15695587. Bibcode2005PNAS..102.2368F. 
  95. "Ever-fluctuating single enzyme molecules: Michaelis-Menten equation revisited". Nature Chemical Biology 2 (2): 87–94. February 2006. doi:10.1038/nchembio759. PMID 16415859. 
  96. "Single-molecule enzymatic dynamics". Science 282 (5395): 1877–1882. December 1998. doi:10.1126/science.282.5395.1877. PMID 9836635. Bibcode1998Sci...282.1877P. 
  97. "Single molecule Michaelis-Menten equation beyond quasistatic disorder". Physical Review E 74 (3 Pt 1). September 2006. doi:10.1103/PhysRevE.74.030902. PMID 17025584. Bibcode2006PhRvE..74c0902X. 
  98. "ENZO: a web tool for derivation and evaluation of kinetic models of enzyme catalyzed reactions". PLOS ONE 6 (7). 2011. doi:10.1371/journal.pone.0022265. PMID 21818304. Bibcode2011PLoSO...622265B.  ENZO server

Bibliography

Ochs, Raymond S (2014). Biochemistry. Burlington, Mass: Jones & Bartlett Publishers. ISBN 978-1-4496-6137-3. 

  • ENZYME — Expasy enzyme nomenclature database
  • ENZO — Web application for easy construction and quick testing of kinetic models of enzyme catalyzed reactions.
  • ExCatDB — A database of enzyme catalytic mechanisms
  • BRENDA — Comprehensive enzyme database, giving substrates, inhibitors and reaction diagrams




Categories: [Enzyme kinetics] [Catalysis]


Download as ZWI file | Last modified: 08/19/2026 20:29:21 | 27 views
☰ Source: https://handwiki.org/wiki/Chemistry:Enzyme_kinetics | License: CC BY-SA 3.0

ZWI is not signed. [what is this?]